l
F.8L Falco Construction Manual
24–8
Revision 4, March 1, 2002
Figure 7
❏
Clamp the leading edge ribs for Sta. 1, 2, 3 and 4 in place as shown in Figure 7. Sand the
aft faces of the ribs as necessary for alignment with the leading edge alignment string.
Figure 8
❏
Clamp the remaining leading edge ribs in place as shown in Figure 8. Sand the aft faces of
the ribs as necessary for alignment with the leading edge alignment string.
Содержание F.8L Falco
Страница 1: ...F 8L Falco Construction Manual...
Страница 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Страница 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Страница 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Страница 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Страница 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Страница 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Страница 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Страница 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Страница 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Страница 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Страница 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Страница 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Страница 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...