3 Maintenance/Safety & Functionality Tests
SenTec Digital Monitoring System
43
3.5
Opening the Membrane Changer
If the sensor is blocked within the Membrane Changer at any position, it can be opened
as follows:
Identify the 6 latches holding together top and bottom part of the Membrane Changer
together (see Figure 11 Opening the Membrane Changer). Insert a screwdriver
behind the latches and use it as leverage to break out the 6 latches.
WARNING: Wear protective goggles while breaking out the 6
latches.
CAUTION: This procedure will irreversibly destroy the
Membrane Changer, but not harm the sensor if executed with
care.
latches
removed
latches
Figure 11 Opening the Membrane Changer
Содержание SDM
Страница 1: ...For the SenTec Digital Monitoring System Software Version SMB V08 02 MPB V06 02 ...
Страница 6: ......
Страница 28: ...3 Maintenance Safety Functionality Tests HB 005615 j 22 Figure 6 Examples PCO2 and PO2 Slope Test ...
Страница 84: ...5 Repairs of the SDM HB 005615 j 78 Figure 17 Positioning of the Docking Station Gasket ...
Страница 93: ...8 Appendix SenTec Digital Monitoring System 87 HB 005615 j Date of release 02 2019 ...