
+49 33631 59 650
[email protected]
w w w .sensys.de
Manual
SBL10
19 / 69
Version 1.27
Preparing the Survey
5
Step 1: Inserting the Batteries
To run the device at least one battery compartment has to be equipped with batteries. To ensure a
better balance and the possibility of a redundant supply power, we recommend filling always both
compartments. To insert batteries, open the compartment cap by turning it counter clockwise.
Insert three single-cell batteries LR20/HR20 with positive terminal pointing into the tube first; then
close the cap carefully by turning it clockwise. If the cap is not placed and locked correctly, the
battery compartment will indicate an error and will be unusable.
Step 2: Preparing the Probe
Using the internal probe see Step 2a
Using the external probe see Step 2b
Step 2a: Aligning the Internal Probe
Loosen the locking screw at the hinge (4). Bring the probe to a vertical position. Now tighten the
locking screw again to prevent the probe from moving accidentally during the survey.
When using the device in borehole and/or underwater surveys, the internal probe
remains in its transport position (parallel to the carrying tube).
Step 2b: Connecting the External Probe (for borehole surveys only)
·
Make sure the rotary switch (7) is in "OFF" position.
·
Check all sealings (D) for integrity. Never use damaged sealings for borehole and/or underwater
surveys.
·
Connect the probe to the probe cable. Make sure to follow the steps below at all times in the given
sequence:
1. Connect the 7-pin plug (A) to the probe.
2. Screw the sealing cap (B) tightly without using any tools.
3. Screw the fitting (C) onto the sealing cap without using any tools.
·
Connect the remaining cable end to the 7-pin MIL connector of the SBL 10 control and display
unit.
·
Turn on the SBL 10 unit by using the rotary switch.
Once the borehole probe has been recognized correctly, the mode display (2) starts blinking after
the SBL10 has war turned on. The internal probe will be turned off automatically. The scan for
connected probes is carried out once after turning on the SBL10. Disconnecting the borehole probe
Содержание SBL10
Страница 4: ......
Страница 59: ... 49 33631 59 650 info sensys de www sensys de Manual SBL10 59 69 Version 1 27 Planned view GPS view ...
Страница 68: ......
Страница 69: ...Customer first Your SENSYS Team ...