12 Registration with the grid operator/electricity supply company
The SENEC.Home Li must be registered with the customer’s electricity supply company following installation.
The electricity supply company requires the following documentation:
•
Manufacturer’s declaration with certificate of conformity, especially conformity with the Low Voltage Directive
VDE AR-N 4105
•
G.2 certificate of conformity for generation installations with integrated grid connection protection
•
G.3 certificate of conformity for grid connection protection
•
Compulsory form F3 with information regarding various measured values
•
F4 test report concerning grid connection protection
•
Test report regarding flickering and harmonics
You can download these documents in a summary PDF file from
www.senec-ies.com
and append them to the
registration with the electricity supply company. You as an installer register with the electricity supply compa-
ny on behalf of the customer.