41
X1.1
P E
P E
P E
L1
L1
L2
N
N
L3
X1.1 X1.2 X1.3 X1.4 X1.5 X2.1 X2.2 X2.3
Electrical
supply
Emergency
power
P E
P E
P E
Eq
ui
po
te
nt
ia
l-
bo
nd
in
g
Figure 20 Terminals in the SENEC.Home Li
7.8 Connection of the PV inverter
Information regarding the installation of the PV inverter(s) may be found in the Overview of certified inverters
and their installation document on the
www.senec-ies.com
website under Downloads -> General downloads.
7.9 Installation of mains backup operation (optional)
Danger to life from electric shock!
The SENEC.Home Li constitutes an IT system in mains backup operation.
Automatic shutdown of the power supply in the event of a fault must
be
ensured.
Fit an insulation monitoring device complying with DIN VDE 61557-8.
Prohibited!
The Mains backup operation output may never be connected to
the
domestic
installation.
Prohibited!
The various Mains backup operation outputs in daisy-chained systems
must never be connected in parallel.