background image

2

Please read these documents carefully and observe the safety instructions.  

Additional copies of all installation instructions must be made available by Deutsche Energieversorgung 
GmbH on request throughout the foreseeable service life of the product.

Original in German - This version ist for Australia only.

Imprint

All rights reserved.

© Copyright:

Deutsche Energieversorgung GmbH

Wittenberger Straße 15

04129 Leipzig

Phone:   

+49 341 87057-0

Fax:    

+49 341 87057-300

Email:    

[email protected]

Website:  

www.senec-ies.com

These installation instructions may only be reprinted or reproduced – even in extract – with the express written 
permission of Deutsche Energieversorgung GmbH.

Содержание HOME LI

Страница 1: ...EC HOME LI TRANSLATION OF INSTALLATION INSTRUCTIONS Valid for SENEC Home Li 10 0 Energy Storage DEV SH 300_V2 Document version 1 0 Publication date 10 01 2017 Document number TD140 010 Country Austral...

Страница 2: ...life of the product Original in German This version ist for Australia only Imprint All rights reserved Copyright Deutsche Energieversorgung GmbH Wittenberger Stra e 15 04129 Leipzig Phone 49 341 8705...

Страница 3: ...14 2 6 4 Further safety symbols 14 2 7 Personal protective equipment 14 3 Transport installation storage 15 3 1 Transport 15 3 2 Installation 15 3 2 1 Installation location 15 3 2 2 Temperature adjus...

Страница 4: ...r configuration 43 7 10 3 Configuration wizard 44 7 10 4 First charge 54 8 Cascading multiple systems 58 8 1 Preconditions 58 8 2 Operating principle 58 8 3 Configuration 58 9 Complete the installatio...

Страница 5: ...5 Change history Version of the instructions From system serial number Amendments 1 0 DE V2 01Li10 00001 Initial version...

Страница 6: ...use of the SENEC Home Li cannot be monitored by the manufacturer For this reason Deutsche Energieversorgung GmbH DEV accepts no responsibility or liability for damage costs and losses arising as a re...

Страница 7: ...s of material damage or general notes on operation This symbol indicates a prohibition which must always be complied with The following conventions are used to aid in the understanding of the installa...

Страница 8: ...ce senec ies com Deutsche Energieversorgung GmbH Wittenberger Stra e 15 04129 Leipzig Tel 49 341 87057 0 Mail service senec ies com The electrical circuit of the SENEC Home V2 Li was labeled as ______...

Страница 9: ...ity is available 2 2 Use not as intended The use of the SENEC Home Li on or in the water e g boats ships offshore installations in the air or for mo bile uses is expressly prohibited Modifications to...

Страница 10: ...ck The capacitors carry a lethal voltage internally and at the terminals of the PV generator Wait at least five minutes before you open the system Use PPE Danger to life from electric shock Exposed el...

Страница 11: ...er on it The battery mod ule can be damaged or destroyed by this A short circuit may also be caused Heat smoke fire or an explosion may result Soldering Do not solder directly on the battery module Th...

Страница 12: ...nergy storage unit Charge the battery cell before first use if it has been stored for more than six months Storage location Do not store the battery module in locations in which water vapour oil vapou...

Страница 13: ...surface 2 6 2 Safety symbols on the identification plate Symbol Meaning Wear eye protection Observe the operating instructions Earth prior to use Warning against hazards arising during charging of bat...

Страница 14: ...t ground prior to main lines Caution High leakage current In any case connect ground prior to main lines 2 7 Personal protective equipment Use insulated tools and the correct protective equipment PPE...

Страница 15: ...stallation location The floor shall be designed to take the weight of the SENEC Home Li The area of the floor in which a person would be within an arm s reach of the battery module shall be sufficient...

Страница 16: ...nt and minimum distances The area shall be suitable for the installation of the SENEC Home Li Plan at least the following installation area W x H x D 580 mm x 1300 mm x 420 mm This also takes into acc...

Страница 17: ...e noted if the battery modules are to be stored for a longer period of time Storage temperature 20 to 35 C Humidity 45 to 85 Note Do not store the battery modules with metal objects water acids or str...

Страница 18: ...front panel with SENEC logo 1 x rear panel with cable bushing 1 x power flow direction sensor 1 63 A direct measurement 1 x identification plate outer panel left 2 x Cat 6 data cable 250 mm 1 x Cat 6...

Страница 19: ...e house wiring to the power flow direction sensor and SENEC Home Li Cable 5 core NYM at least 2 5 mm2 to a maximum of 6 mm2 flexible with wire end ferrules In the house wiring Residual current device...

Страница 20: ...L IN L IN INPUT OK EXT EXT L OUT L OUT L OUT A1 A2 N L1 L2 L3 11 12 14 21 22 24 31 32 34 R1 R2 R3 ESC ENT PROG 1 2 3 4 5 RE NA003 www tele online com 21 33 22 34 EH 04 11 ESB 24 40 230V 240 AC DC 40...

Страница 21: ...V I 3 x 16 A C5 at 30 C 56 7 Ah per module f 50 Hz Tmin Tmax 0 C 30 C Pmax 3 x 3680 W Smax 3x 3680 VA International protection code IP20 Year of manufacture 2017 14 16 13 Figure 3 Product view of SENE...

Страница 22: ...odes are shown on the display The dis play is found on the front of the SENEC Home Li at the top Always switch the SENEC Home Li off via the display If you have switched the sys tem off via the displa...

Страница 23: ...the PV inverter is connected PV 1 for PV inverter 1 J4 Bus 4 COM 1 COM 2 This is where multiple SENEC storage units connected in cascading operation are connected 6 1 4 SENEC Home Li connections The e...

Страница 24: ...d for future applications Figure 6 Overview of communication connections on the SENEC Home Li 1 2 3 4 5 6 7 8 9 10 Note If necessary terminate one cable end and thereby mark the end of a bus system by...

Страница 25: ...at home Independence from the pub lic power network is increased to up to 80 depending on consumption habits Use of excess mains current If Econamic Grid is being used the SENEC Home Li receives exces...

Страница 26: ...s it in the battery block When alternating current is required in the household the SENEC Inverter converts the direct current back into alternating current and feeds it into the domestic power networ...

Страница 27: ...ze W H 65 mm 35 mm Mains backup operation yes Time to switchover to mains backup operation 700 ms Built in VPN router yes Operating mode fully automatic Communication with inverter RS485 direct invert...

Страница 28: ...y module weight 25 kg Overtemperature protection automatic power regulation by integrated battery management system Deep discharge protection by an integrated battery management system Battery protect...

Страница 29: ...le to up to 16 years guarantee conditions at www senec ies com be valid Permanent connection means that any Internet downtime must not last more than five min utes Occasional reconnection or recurring...

Страница 30: ...tum des Messstellenbetreibers 1 ISK00 6393 8492 27 743 806 Nr 63 938 492 51 7351 14 40 ER L1 L2 L3 kW M14 Drehstromz hler 1376 T1 T2 T4 T3 KD PD T4 D FF SET 2014 Made in EU Type MT174 D1A52 V22 M3K03Z...

Страница 31: ...L2 L3 kW 37 36 35 ABB M14 Drehstromz hler 1376 T1 T2 T4 T3 KD PD T4 D FF SET 2014 Made in EU Type MT174 D1A52 V22 M3K03Z 3x230 400 V 0 25 5 85 A Schltg IS16050 0 9 1 0 9 2 x 7 0 1 8 0 1 8 x 2 8 0 2 8...

Страница 32: ...z hler 1376 T1 T2 T4 T3 KD PD T4 D FF SET 2014 Made in EU Type MT174 D1A52 V22 M3K03Z 3x230 400 V 0 25 5 85 A Schltg IS16050 0 9 1 0 9 2 x 7 0 1 8 0 1 8 x 2 8 0 2 8 x F F 0 Uhrzeit Datum Aktuelle Wirk...

Страница 33: ...3 x 16 A The power flow direction sensor may not be fitted in the top sealed part of the meter cabinet Make sure that the phases are identical The SENEC Home Li is connected like any consumer The shor...

Страница 34: ...and all other accessory parts and tools suitable for the assembly operations ready 2 Stand the pre assembled SENEC Home Li in position and remove the side panels using a suitable tool 3 Level the SENE...

Страница 35: ...ctric shock The battery modules must always be switched off when being connected to the DC connection SENEC Home Li 2 5 Fit module 1 at the position illustrated SENEC Home Li 5 0 Fit modules 1 and 2 a...

Страница 36: ...ons 7 Connect the terminals on the modules to the connection rails Use the terminal connectors terminal screws and washers supplied for this Eight terminal connectors are always provided to allow for...

Страница 37: ...nnector D length 430 mm Terminal connector E length 530 mm Terminal connector F length 370 mm Terminal connector G length 430 mm Terminal connector H length 320 mm Figure 14 Connecting the terminals o...

Страница 38: ...further battery modules and the MCU Figure 16 Battery module 1 assigned as the master 10 Now depending on the configuration of your SENEC Home Li storage unit connect the further battery modules with...

Страница 39: ...nection of the communication connections between the modules 11 Set the S M switch on battery modules 2 to 4 as appropriate to the S slave setting These battery modules are now subordinate to battery...

Страница 40: ...nnection at www senec ies com en The AC connection is made at the terminal block in the SENEC Home Li case Cables between 2 5 mm2 and a maximum of 6 mm2 flexible with wire end ferrule can be connected...

Страница 41: ...www senec ies com website under Downloads General downloads 7 9 Installation of mains backup operation optional Danger to life from electric shock The SENEC Home Li constitutes an IT system in mains...

Страница 42: ...S3 L 14 12 A2 N L WR X107 F1 10 A ABB S201 B10 2CDS251001R0105 1 2 11 12 14 ABB ABB CM IWS 2S 1SVR730670R0200 K1 Finder 48 61 7 0 12 00 50 A1 A2 WR X701 Figure 21 Monitoring an unearthed 2 core IT AC...

Страница 43: ...ched on 4 Switch on the 3 pin B16 A miniature circuit breaker in the house wiring The MCU in the system boots The SENEC Inverter now checks for a grid connection and connects to it 5 Switch on the DC...

Страница 44: ...until an IP address is shown on the SENEC Home Li display and read it off 7 10 3 Configuration wizard To complete the installation the SENEC Home Li is now configured for the first time with the help...

Страница 45: ...on the SENEC Home Li The graphical user interface of the SENEC Home Li opens This is where you enter the configuration Please login USER PASSWORD 2 Enter your login data in the Login window The login...

Страница 46: ...ome Li is permanently connected to the Internet and confirm your input by clicking on Next The connection to www mein senec de is verified automatically in the bottom line Error will be shown here if...

Страница 47: ...ive a weekly analysis of his SENEC Home Li data as a csv file a moni toring CSV notification and whether the end customer would like to receive the newsletter Confirm by clicking on Next If you are bo...

Страница 48: ...il address entered a password will still have to be selected and further information given This information will be discarded by the system if a query shows that an account with this email address alr...

Страница 49: ...Select the phases grid connection 1 Phase 12 If you are using a non certified inverter and hence have fitted a second power flow direc tion sensor check the measures consuption box or the measures ge...

Страница 50: ...ied PV inverter under PV invert er If the non certified PV inverter is the only PV inverter used select Please select under Manufacturer and select None for Num ber 18 Enter the relevant RS485 address...

Страница 51: ...phases or the power for the individual phases 24 Select the minimum temperature that should be maintained under any circumstances 25 Select the maximum temperature that must not be exceeded 26 Select...

Страница 52: ...sor enter ABB B2x 30 If a ripple control receiver is used Enter the re duction specification if it is directly connected to the SENEC storage unit 31 Set the reactive power according to the elec trici...

Страница 53: ...ery modules from a top view and upload it to the wizard If this is not possible upload the photo retro spectively at www mein senec de The photo is a precondition for a full guarantee 38 Make a note o...

Страница 54: ...toring system to Setup Setup and check that OK shows next to State If this is not the case check your installation 2 Launch the Start Test mode by clicking on Setup and then Start Test 3 Enter the use...

Страница 55: ...tual current SENEC Home Li 2 5 20 24 A SENEC Home Li 5 0 30 36 A SENEC Home Li 7 5 40 48 A SENEC Home Li 10 0 45 65 A The discharge test is run at half power The following values are expected for Actu...

Страница 56: ...aximum voltage variation permitted is 5 V 6 Confirm the input screen by clicking on Please confirm A full load test is now performed The system is discharged for 5 minutes The following values are exp...

Страница 57: ...57 Image Action step 9 Confirm by clicking on Please confirm...

Страница 58: ...st be defined for cascading The main system master is configured as if it were the only system Only the master system is connected to the PV inverter or power flow direction sensors The subsidiary sys...

Страница 59: ...e systems if only two systems are being cascaded Example One main system and two subsidiary systems are being installed Set jumper J4 on both the MCU of the main system and on the MCU of the second su...

Страница 60: ...Set the Modbus address of the subsidiary system in the address field 14 Click on Next 15 Make your settings without configuring Power Direction Flow Sensors The checkboxes measures consumption and mea...

Страница 61: ...61 Image Action step 17 Restart the subsidiary system on completion of the configuration 18 Proceed in the same way to install further subsidiary systems...

Страница 62: ...Ensure all installed cables are enclosed in the SENEC Home Li Use cable ties if necessary to fasten them in the system 2 Fit the side panels to the SENEC Home Li 3 Complete the identification plate u...

Страница 63: ...ty insufficient No or poor contact between terminals and connection rails through terminal connectors Local Monitoring is not available where Econamic Grid is used SENEC Home Li communicates via the V...

Страница 64: ...guarantee are to be satisfied The following conditions must be met during registration A photo of the fully installed SENEC Home Li without side panels System registration within two weeks if the syst...

Страница 65: ...certificate of conformity for generation installations with integrated grid connection protection G 3 certificate of conformity for grid connection protection Compulsory form F3 with information rega...

Страница 66: ...the front display It provides information concerning how the storage unit is connected to the network IP address Explanation 192 168 168 2 During start sequence 192 168 xxx xxx or 10 xxx xxx xxx SENEC...

Страница 67: ...ed switch the battery module s of by setting the OFF ON switch to OFF Observe the rules in section 3 3 Storage if the batteries are to be stored Section 12 7 Operating statuses of the battery modules...

Страница 68: ...of charge Setup Date time Here you set the date and time on the system These are only rel evant for local monitoring not for on line monitoring The changeover from summer to winter time is not automat...

Страница 69: ...reater precision A weekly analysis using a CSV file is also possible Above all online monitoring makes initial remote diagnosis of faults or malfunctions possible To this end the installer or a collea...

Страница 70: ...Charging device There is a problem with the SENEC Inverter Possible causes battery isolating switch switched off mains connection fault battery modules are not supplying any energy Causes modules are...

Страница 71: ...C In verters No connection to server The system expects a constant connection to the server has however had no connection to the mein senec de for a contin uous 24 hours and is now shutting down Norma...

Страница 72: ...thium modules A technician must be called Safety charge completed The system is fully charged and is waiting for user input Software update The system is running a software update 13 8 Operating statu...

Страница 73: ...tware update If the SENEC Home Li is not permanently connected to the Internet a software update is required at every service You must run a software update at least once a year You will have to bring...

Страница 74: ...y Road CHP plant Combined heat and power plant DEV Deutsche Energieversorgung GmbH DHCP Dynamic Host Configuration Protocol communication protocol for the as signment of network configurations DoD Dep...

Отзывы: