52
Image
Action step
29. For the model of power meter (power flow di-
rection sensor) enter: ABB B2x.
30. If a ripple control receiver is used: Enter the re-
duction specification if it is directly connected
to the SENEC storage unit.
31. Set the reactive power according to the elec-
tricity supply company's specifications.
32. Confirm your entries by clicking on “Next”.