DT-E 1.3: SUN PROTECTION SCREEN – VENETIAN BLINDS C80P and C80L
Issue 3 / April 2017 / EN
page 37 / 62
2.
Assembled cover panels with their brackets secure to the
wall/ niche with proper bolts.
3.
Tighten bolts of main cover panels to the wall/ceiling.
Picture 2
4.
Check level of mounted covers with their brackets, adjust
if necessary. Proper levelling of the assembled system is
essential for its proper operation.
Picture 3
5.
Measure the distance from the bottom of head rail to
the underneath of bottom bar (of the rolled up blind).
Picture 4
6.
From the guide rail cut off a length measured in Step 5.
Follow the step for the second guide rail.
ATTENTION:
In the bottom part of guide rail the edges
that guide the gasket are kneaded. The section of guide
rail that is cut off should be cut from the upper part of
the rail.
Picture 5
7.
Section of the cut off guide rail install in the upper part of
mounting profile, using tapping or self-drilling screw, as
shown in Fig. 4. The head of the screw should not block
pins in the slats. Follow the step for both guide rails.
Attention:
in case of using tapping screws it is
recommended to pre-drill guide rail and mounting profile
accordingly to diameter of the used screw.
Picture 6