Installation Guide for Betta 7000 Straight Drop Awning
with Wire Guide and Brackets
Please Note: These instructions should be read thoroughly before installing.
This is a guide to assist in the installation and care of your external awnings. Betta Blinds and Awnings do not
guarantee the accuracy of the information contained in this guide. We recommend an experienced expert installer
to rely upon their own skills. This is based on general knowledge concerning the assembly, materials and working
process of the external blinds, which is known to us at the time of printing this guide, consequently, is subject to
change and Betta Blinds and Awnings specifically reserves the right to change this guide without notification.
Ensure all components are included in your packaging, before proceeding to install:
Universal brackets x 2
Gearbox
Blind
Wire cable x 2
Rapid Lock 15mm & 35mm x 2
Release Key x 1
Barrel Nut x 2
Nut x 6
L Bracket or Deck hinge, (whichever is
required)
Crank handle
(if required)
Split pin x 1
Pivot pin and plate with nut and bolt
Latch & Saddle
(if required)
Nut & Bolt for gear x 2 each
You will also need: Screws, plugs, Philips head screwdriver, good quality wire snips, drill, hammer drill (if drilling
into concrete), measuring tape and spirit level
If installing on a brick wall NEVER put the screw into a mortar line.
If the position, you need to drill is over a
mortar line move up to the centre of the brick above that position.
Check the size of your blind against the label, which will be attached to the packaging, or it could be on the
blind.
1. Install the pivot pin into the end of the blind and plate to the idle end bracket, using nut and bolt provided. You
will now have two different brackets the control end and idle end.
2. Install Brackets - The outside measurement from bracket to bracket is the OPEN size, it is the width of your
awning. Mark where the control end bracket is to be installed and the idle end. Drill, plug and attach brackets.
Ensure that the positions where the fasteners run through the brackets are secured into brick, or into the wall’s
structural support.
NB: Ensure that the brackets are fitted level horizontally.
4. Attach gearbox to bracket, using nut and bolt provided. The gearbox can be positioned on two different angles
depending on fitting requirements. The gear can be positioned vertically or on a 25 degrees angle facing out,
use appropriate bracket holes for the gear position you need. Betta Blinds recommend the gearbox to be
angled outwards for ease of use.
NB: Bolt from the outside in.
5.
Hang the blind. The motor end / crank end (square tube end) goes in first. Drop the other end onto the slotted
part of the pin. Secure this end with the split pin supplied.
6.
Installing wire cable
- To assemble the Rapid Lock, first push and twist the wire into the 35mm Rapid Lock
stud (the longer stud) till it reaches the end. Wire needs to be twisted in the direction as shown below to avoid
fraying. Then, pull to tighten.
7.
NOTE:
To release the wire,place release key on the wire and push it into the rapid lock stud and pull wire out