background image

 

DT-E 1.3: SUN PROTECTION SCREEN – VENETIAN BLINDS C80P and C80L                                                                                                                                                        
Issue 3 / April 2017 / EN                                                                                                                                                                 

 

        page 17 / 62                                                                                    

 

 

 

 

 

 

           

 

 
 
 
 
 
 
 
 
 
 

Img. 12 

 

 

5.

 

Secure guide rails in brackets by tightening the 

cone shaped screw. 

 
 
 

 
 
 
 

Img. 13 

 

6.

 

Check the vertical level of the guide rail. Repeat 

points 4 and 5 to install the second guide rail.

 

 
 
 
 
 
 

Img. 14 

 

7.

 

Check the level of the guides. 

 
 
 

 
 
 
 
 
 

Img. 15 

Содержание Venetian Blind C80

Страница 1: ...1 Sun protection screen Venetian Blind 1 3 Venetian Blinds C80 and C80 L TECHNICAL AND OPERATIONAL DOCUMENTATION INSTALLATION AND OPERATING MANUAL AND INSTRUCTIONS FOR SAFE USE 1 3 DT E DTE DT E...

Страница 2: ...9 Opole ul Wschodnia 23A Plant address Wydzia aluzji Fasadowych i Refleksoli Fa ade and External Textile Roller Blind Department 45 449 Opole ul Wschodnia 23A Contact details Tel 48 77 553 21 00 sekre...

Страница 3: ...of venetian blind C80 with cube and oval guide rail group installation 21 4 5 4 installation of venetian blind C80 motor and cable guide 29 4 5 5 Concealed guide rail installation 33 4 5 6 Window fram...

Страница 4: ...of Laws 2011 124 Linked documents Declaration of performance Declaration of conformity product with motor and manual of installation and use of motors and control 1 2 NOTES ON SYMBOLS AND MARKS The b...

Страница 5: ...ORTANT INFORMATION REGARDING SAFETY WARNING FOLLOWING THE MANUAL IS ESSENTIAL FOR SAFETY OF PEOPLE KEEP THIS MANUAL The documentation is valid jointly with the information concerning a specific produc...

Страница 6: ...owing parameters supply voltage 230V 50Hz power 90 to 230 W depending on the motor type and blind size current consumption 0 4 to 1 A depending on the motor type and blind size protection level IP 44...

Страница 7: ...ty for operators as long as they are used properly 3 PRODUCT TRANSPORT AND STORAGE 3 1 COMPLETENESS AND QUALITATIVE STATE OF DELIVERY Selt Sp z o o makes every effort to ensure that the goods are prod...

Страница 8: ...rts installation is made to the structures of sufficient wall thickness before starting the installation remove all unnecessary elements from the installation area before starting the installation all...

Страница 9: ...e its malfunction using any chemical substances containing bituminous substances or any other substances making reactions with the product is forbidden Improper installation may cause hazardous situat...

Страница 10: ...panels if they occur to the wall or niche with an adequate tool 5 Tighten the main brackets to the wall ceiling Img 2 6 Check the level of installed cover panels and brackets correct if necessary App...

Страница 11: ...ide rails types for C80 Venetian Blind with cover panel Single guide rail Double guide rail for modular installation Single and double guide rail bracket types Type 1 standard Type 2 Type 3 Type 4 Typ...

Страница 12: ...April 2017 EN page 12 62 12 Slide the guide rails brackets to the guides Then secure the brackets in the guides by tightening the cone shaped screw Img 8 Img 14 13 Slide the guide rail on the slat pin...

Страница 13: ...xis Then tighten the elements of the bracket Img 18 17 Install guide rails end caps Img 19 After the installation is finished set the end positions and check the correct functioning of the blind 4 5 2...

Страница 14: ...lt with allen wrench no 4 Screw tightening should be done with maximum half turn 180 NOTE bigger turn will result in breaking the screw out from the bracket Self supporting bracket Manner of installat...

Страница 15: ...l brackets installation Then install the brackets Img 1 2 According to previous measurements install the brackets to the facade Number of brackets depends on the product dimensions During installation...

Страница 16: ...EEN VENETIAN BLINDS C80P and C80L Issue 3 April 2017 EN page 16 62 Img 7 Img 8 Img 9 3 Loosen cone shaped screws securing the bolts and pull the bolts out img 9 and 10 Img 10 4 Slide the guide rails o...

Страница 17: ...Issue 3 April 2017 EN page 17 62 Img 12 5 Secure guide rails in brackets by tightening the cone shaped screw Img 13 6 Check the vertical level of the guide rail Repeat points 4 and 5 to install the se...

Страница 18: ...placed in the cassette Img 16 9 Loosen the installation flat bar on the cassette side Img 17 10 Connect the cassette with guide rails by sliding the installation flat bars into the guide rail channel...

Страница 19: ...for correct functioning of the product Img 21 12 Install top end caps in the guide rails Img 22 13 Slide the head rail with slats bundle to the guide rails remembering that the label strona od okna sh...

Страница 20: ...0 cm of the blind to facilitate the installation of the bundle to the cassette Img 25 15 Install the head rail with bundle to open head rail brackets Close the bracket and tighten the screws img 26 27...

Страница 21: ...VENETIAN BLIND C80 WITH CUBE AND OVAL GUIDE RAIL GROUP INSTALLATION 1 Measure and mark the installation spot of the first guide rail bracket img 1 3 Img 1 Img 2 Img 3 2 Install the bracket to facade w...

Страница 22: ...80L Issue 3 April 2017 EN page 22 62 Img 6 4 Install the second bracket Img 7 5 Measure and mark the installation spot of the next bracket img 8 install the bracket img 7 Img 8 6 Check the vertical le...

Страница 23: ...62 7 Measure and mark the installation place of the second guide rail img 10 and 11 Img 10 Img 11 8 Install the next bracket Measurement and marking for the following brackets should be done similarly...

Страница 24: ...vertical level of installed brackets Img 14 11 Loosen cone shaped screws securing the bolts and pull the bolts out Img 15 Img 16 12 Slide the guide rails on bracket bolts img 17 settle the guide rail...

Страница 25: ...l 2017 EN page 25 62 Img 18 Img 19 13 Check the level of installed guide rails Img 20 14 Loosen the installation flat bar in the cassette so that it can be slide on the guide rails Img 21 15 Install t...

Страница 26: ...VENETIAN BLINDS C80P and C80L Issue 3 April 2017 EN page 26 62 16 Put the cassette on guide rails Img 23 17 Check the vertical and horizontal level of the cassette img 24 25 Img 24 Img 25 18 Tighten...

Страница 27: ...17 EN page 27 62 19 Install the middle guide rail Img 27 20 Insert the head rail with bundle to the guides Img 28 21 Put the head rail with bundle into the open bracket so that the label strona od okn...

Страница 28: ...62 23 Install the consecutive bundles to brackets Img 31 24 Slide the cover profile to external guides img 32 and cut the excess at the level of the guides edges img 33 Img 32 Img 33 25 Put the guide...

Страница 29: ...all the revision cover img 36 37 Img 36 Img 37 With the installation cable check the correct functioning of the product and setting of end positions 4 5 4 INSTALLATION OF VENETIAN BLIND C80 MOTOR AND...

Страница 30: ...esistance is felt then use a flat wrench img 3 performing two full turns Exceeding this scope results in overtightening the screw head Img 2 Img 3 3 Put the cable guide through opening in the cable gu...

Страница 31: ...Issue 3 April 2017 EN page 31 62 5 With the use of spirit level mark the place of cable guide bracket installation Img 6 6 Install the angle bracket to the base Img 7 7 Put the cable through facade ti...

Страница 32: ...aring in mind to leave some clearance required for correct tightener functioning Exceeding the scope mention above results in damaging the screw socket or the wrench ending Img 10 10 Loosen upper scre...

Страница 33: ...positions according to the motor manual 3 Do not pull cable guides it might rip them apart or damage the fixing of upper brackets 4 5 5 CONCEALED GUIDE RAIL INSTALLATION Application of concealed side...

Страница 34: ...upporting substructure that will provide stability and correct profile alignment Profiles must be mounted parallel to each other in all planes Profile must be positioned in the way that its upper edge...

Страница 35: ...with plane of the plaster finishing material of the window niche For the single blind the width is described in Fig 3a Modular installation double and multiblind requires determining of how the blinds...

Страница 36: ...don t interfere with lifting mechanisms and with the motor 19 Initially fix the auxiliary bracket to the main bracket Then put them against cover panel adjust to proper length and tighten the screw Pi...

Страница 37: ...rolled up blind Picture 4 6 From the guide rail cut off a length measured in Step 5 Follow the step for the second guide rail ATTENTION In the bottom part of guide rail the edges that guide the gaske...

Страница 38: ...to easily open the lock in the bracket 11 Insert the bundle in head rail bracket and secure the bracket 12 Connect the motor to the power supply Attention The bundle should end at the same height as t...

Страница 39: ...de rail for niche installation only cover panel without end caps is available the width of the cover equals width of the niche Fig 5 Window frame guide rail elements Guidelines for window frame guide...

Страница 40: ...g the installation of Venetian Blind it is necessary to measure and mark the placement of main brackets for cover panel in such place so that they do not collide afterwards with rolling mechanisms and...

Страница 41: ...e the set of brackets with cover panels 3 Tighten main brackets to wall ceiling Img 2 4 Check the level of installed covers with brackets correct if necessary Correct leveling of the system is necessa...

Страница 42: ...n be tilted so that the pins are not damaged Img 7 10 Lift the bundle and install head rail in brackets Pay attention so that the pins are introduced correctly into the guide rail 11 Loosen screws of...

Страница 43: ...EN page 43 62 14 Place profile on whole length of the window frame guide rail Img 10 15 Immobilise the ends of guiding profile with silicone installation glue or silicone hot glue Img 11 16 Install c...

Страница 44: ...advised for the installation of Venetian Blind on facades with thermal insulation Under plaster cassette limits the effect of thermal bridge and provides aesthetical finishing of the fa ade without re...

Страница 45: ...g 12a shows window frame installation Fig 12b shows niche installation Installation of the guide rail must be fixed to the base as well as it should be linear and perpendicular to Venetian Blind Guide...

Страница 46: ...r diameter for the installation of the under plaster cassette to avoid deformations of the cassette Under plaster cassette is delivered without hole for feeder cable It has to be done individually acc...

Страница 47: ...heme of preparation of the installation holes in the under plaster cassette variable dimension usually 30 mm Fig 14 Scheme of preparation of the installation holes in the guide rail profiles b Install...

Страница 48: ...according to Fig 13 Img 3 3 Drill installation holes in the cassette in marked places Img 4 4 Put the cassette on facade and mark places for drilling installation holes in the facade NOTE Cassette ha...

Страница 49: ...h appropriate fixing product Img 7 7 Install head rail brackets in the under plaster cassette Img 8 8 Lossen screws of the bracket so that it is easy to open Img 9 9 Slide head rail with bundle into t...

Страница 50: ...sition the head rail in reference to the cassette and tighten the bracket screws Img 11 11 Install guide rail to the underplaster cassette and fasten it to base or subconstruction with appropriate fix...

Страница 51: ...n has to be paid during placement of guiding profile so that no damage is done to the guiding profile by slat pins Img 16 Fig 15 14 Install guiding profile along full length of the guide rail and inst...

Страница 52: ...ting the drive and control system to the previously prepared systems power supply and control systems Connection to the power supply system should be made in accordance with the previously elaborated...

Страница 53: ...th motor s maintenance manual prior to the first start of the product electrical measurements should be performed do not start the engine without checking the correctness of system installation When t...

Страница 54: ...r damaged in a way making it impossible to read them It is forbidden to introduce modification in the electrical design or in the equipment configuration without consulting the manufacturer or an auth...

Страница 55: ...m damage Stay clear of the work area of the slats while the system is working It is forbidden to use a product not conforming to the electric shock and fire safety requirements It is forbidden to exce...

Страница 56: ...suitably qualified people 6 SYSTEM USE AND MAINTENANCE 6 1 USING THE PRODUCT IN ACCORDANCE WITH ITS INTENDED USE The system should be used in accordance with its intended use determined by the manufac...

Страница 57: ...the mounting of the changed sub assembly Products manufactured by SELT Sp z o o do not require special maintenance treatment Using the product in accordance with the manufacturer s recommendations as...

Страница 58: ...s delivered to the Supplier in a manner not allowing for operation check e g cut off motor cable receiver in parts Damages resulting from incorrect installation of the product self repairs and adjustm...

Страница 59: ...a detailed description of the defect the name of the company which assembled the product and the date of finding out the defect Product with no invoice number order or contract number will be conside...

Страница 60: ...verse effect on the environment and human health No Subject European legal basis Polish legal basis 1 Waste electrical and electronic equipment Directive 2012 19 EU of the European Parliament and of t...

Страница 61: ...A POLAND 12 EN 13659 Venetian Blinds C 80LH 350x250 Venetian Blinds C80 LH 220x400 For external use Wind load resistance class 1 Additional thermal resistance R 0 0 Total solar energy transmittance g...

Страница 62: ...ype C according to EN 14501 2005 detailed data depending on the fabric type are given in a table on manufacturer s website SELT Sp z o o Opole ul Wschodnia 23A POLAND 12 EN 13659 Venetian blinds C 80...

Отзывы: