DT-E 1.3: SUN PROTECTION SCREEN – VENETIAN BLINDS C80P and C80L
Issue 3 / April 2017 / EN
page 41 / 62
NOTE:
For installation on window frame in the rear
part of cover panels type 2, 4 and 4a it is necessary to
cut on the left and right side small piece to enable the
installation of guide rail. The cut should be done
according to scheme from fig. 7.
Fig. 7
2.
Fasten to wal lor niche the set of brackets with cover
panels.
3.
Tighten main brackets to wall/ceiling.
Img. 2
4.
Check the level of installed covers with brackets,
correct if necessary. Correct leveling of the system is
necessary for its correct operation.
Img. 3
5.
Drill mounting holes in the guide rails according to the
above description.
NOTE:
Guide rails can be delivered pre-drilled if
agreed with advance. Preparation of mounting holes
is a service subject to additional costs.
Img. 4
6.
Measure and mark mounting places for guide rail.
7.
Make installation holes for window frame guide rail.
Img. 5