DT-E 1.3: SUN PROTECTION SCREEN – VENETIAN BLINDS C80P and C80L
Issue 3 / April 2017 / EN
page 15 / 62
1.
Measure and mark the spots for guide rail
brackets installation. Then install the brackets.
Img. 1
2.
According to previous measurements, install the
brackets to the facade. Number of brackets
depends on the product dimensions. During
installation verify the dimensions and vertical
and horizontal linearity of the brackets. Correct
if necessary. (img. 2-8.)
Img. 2
Img. 3
Img. 4
Img. 5
Img. 6