44
9
Dismantling/reassembly
Ausgabe
issue
A / 05.12.2012
Dokument
document
OM.PJT.21e
Blatt
sheet
4 (5)
9.2.3.2 Mount universal joint sleeve (405) on rotor side
9.2.3.3 Coupling rod (400) – connect plug-in shaft (307)
Moisten the surface of coupling rod (400) /
inner surface of universal joint sleeve
(405) with joint grease (maintenance
chapter 7.).
Slide on universal joint sleeve (405).
Remove air from the inside of the joint.
–
Use suitable tool (WS).
Assemble the holding band.
–
Holding band assembly
(chapter 9._).
Adapt diameter and width of the holding
bands to the universal joint sleeve.
Push universal joint sleeve (405) and hold-
ing bands (406, 407) onto coupling rod
(400).
Push on retaining sleeve (401).
Fill joint head of the plug-in shaft (307) with
joint grease (GF).
Slide the plug-in shaft (307) onto the cou-
pling rod (400).
Insert coupling rod pin (402).
Tool (W5/drift)
Slide in the coupling rod pins (402).
Knock the guide bushings (403) in.
–
Use tool (W5).