GENERAL RULE
S
PAGE
5
8
700+
smgr.fm
S
AF
ETY M
AN
U
AL
15.18
Remember to mount and dismount the unit using the “3-Point
Rule.” One hand and two feet or two hands and one foot are to be in contact with
a secure surface at all times (Figure 73).
15.19
Inspect the repairs.
After modifications to structural members
(boom, outriggers, tower, etc.) the repair must be inspected by qualified personnel
before use.
15.20
Always use the correct tools for the job.
Tools should be kept
clean and in good condition.
15.21
If you see a coworker engaging in an unsafe practice, warn him
about the dangers. Safety is always in the hands of those on the job!
15.22
After any repair is completed, test the function of the repaired
part to be sure the repairs were done correctly.
WARNING
safestep.eps
Figure 73
The 3-Point Rule
WARNING
WARNING
WARNING
WARNING
Содержание SPB 28
Страница 2: ......
Страница 4: ......
Страница 8: ...8 Table of Contents SPB Operation Manual...
Страница 10: ......
Страница 16: ...16 Introduction SPB Operation Manual...
Страница 18: ......
Страница 22: ...22 Specifications SPB Operation Manual SPB 35 Working Range Diagram SPB 35 235...
Страница 24: ...24 Specifications SPB Operation Manual Working Range Diagram SPB 37 SPB 37 235...
Страница 26: ......
Страница 28: ...28 Safety S 39 41 SX Operation Manual...
Страница 113: ...402indexcov eps ALPHABETICAL INDEX 700indxcov fm PAGE 83 SAFETY MANUAL Alphabetical Index...
Страница 122: ...30 Overview S 39 41 SX Operation Manual...
Страница 154: ...62 Operation SPB Operation Manual Lifting Instructions 1 of 3...
Страница 155: ...63 Operation SPB Operation Manual Lifting Instructions 2 of 3...
Страница 156: ...64 Operation SPB Operation Manual Lifting Instructions 3 of 3...
Страница 200: ......
Страница 216: ...124 Appendix SPB Operation Manual...