GENERAL RULE
S
PAGE 14
700+
smgr.fm
S
AF
ETY M
AN
U
AL
6.8
It is crucial to take power lines into consideration during
setup, even if they are away from the area to be pumped!
Accidents occur dur-
ing clean-out and moving that can be avoided by proper initial setup. In the illus-
trations below, the pour is outside of the minimum safety distance, but the danger
still exists. You
must
be aware of power lines at all times! (See Figure 16.)
DANGER
shckbhnd.eps
Slewing Radius
of the Boom
Slab to be
Poured
High-Voltage
Power Lines
Minimum of 20
-foot clearance
from wires
(50-foot above
350 Kv).
Extremely hazardous area that is
within the slewing radius of the boom.
Columns to be
Poured
tvdgrbhd2.eps
Slewing Radius
of the Boom
Slab you
poured
High-Voltage
Power Lines
Minimum of 20-foot
clearance from wires.
(50-foot if over 350 Kv)
clnotdgr2.eps
Extremely hazardous area that is
within the slewing radius of the boom.
Figure 16
The hazard exists even if the power
lines are not in the area of the pour
Содержание SPB 28
Страница 2: ......
Страница 4: ......
Страница 8: ...8 Table of Contents SPB Operation Manual...
Страница 10: ......
Страница 16: ...16 Introduction SPB Operation Manual...
Страница 18: ......
Страница 22: ...22 Specifications SPB Operation Manual SPB 35 Working Range Diagram SPB 35 235...
Страница 24: ...24 Specifications SPB Operation Manual Working Range Diagram SPB 37 SPB 37 235...
Страница 26: ......
Страница 28: ...28 Safety S 39 41 SX Operation Manual...
Страница 113: ...402indexcov eps ALPHABETICAL INDEX 700indxcov fm PAGE 83 SAFETY MANUAL Alphabetical Index...
Страница 122: ...30 Overview S 39 41 SX Operation Manual...
Страница 154: ...62 Operation SPB Operation Manual Lifting Instructions 1 of 3...
Страница 155: ...63 Operation SPB Operation Manual Lifting Instructions 2 of 3...
Страница 156: ...64 Operation SPB Operation Manual Lifting Instructions 3 of 3...
Страница 200: ......
Страница 216: ...124 Appendix SPB Operation Manual...