87
Operation
SPB Operation Manual
5’ (1.5m)
Figure 59
Lower edge of tower must not get closer than 5 feet to
the lowest climbing floor frame
3. When the desired height is reached, se-
cure the boom tower with wedges.
To secure, drive eight wedges (Item 1 Figure 49
and Figure 50) into the guides of the upper frame
and eight wedges into the guides of the lower
frame (arrows, Figure 49).
Wedges should never be driven in more than two
floor frames.
Remember that A minimum distance between
floor frames is required. Due to the variety of
models available, please contact the factory for
corresponding technical data (have the serial
number of the unit ready).
Adding Safety Chains
Clip the safety chains to the weldment loops on the
wedge pins. The safety chains will hold the wedges in
place (Figure 48).
Figure 60
Wedge pin safety chains
Содержание SPB 28
Страница 2: ......
Страница 4: ......
Страница 8: ...8 Table of Contents SPB Operation Manual...
Страница 10: ......
Страница 16: ...16 Introduction SPB Operation Manual...
Страница 18: ......
Страница 22: ...22 Specifications SPB Operation Manual SPB 35 Working Range Diagram SPB 35 235...
Страница 24: ...24 Specifications SPB Operation Manual Working Range Diagram SPB 37 SPB 37 235...
Страница 26: ......
Страница 28: ...28 Safety S 39 41 SX Operation Manual...
Страница 113: ...402indexcov eps ALPHABETICAL INDEX 700indxcov fm PAGE 83 SAFETY MANUAL Alphabetical Index...
Страница 122: ...30 Overview S 39 41 SX Operation Manual...
Страница 154: ...62 Operation SPB Operation Manual Lifting Instructions 1 of 3...
Страница 155: ...63 Operation SPB Operation Manual Lifting Instructions 2 of 3...
Страница 156: ...64 Operation SPB Operation Manual Lifting Instructions 3 of 3...
Страница 200: ......
Страница 216: ...124 Appendix SPB Operation Manual...