Assembly
32
06.00 | NSR-A | Assembly and Operating Manual | en | 389722
5 Assembly
5.1 Assembly requirements
Before beginning assembly, request SCHUNK installation
drawings
Provide air bleed screw for the piston chamber
When connecting the pallet changing system, it should be noted
that it is only possible to completely ventilate the piston chamber
via the air connections during the locking procedure. The relevant
valves or shut-off valves should therefore be equipped with load
relief. This also applies to the locked connection. If the locked
connection is not used, the relevant side of the piston must be
able to ventilate.
When disconnecting hose lines, the relevant openings must be
secured with seal plugs to prevent ingress of dirt or cooling
lubricant.
Observe tolerances when linking pallet changing systems
If there is a coupling interface of 2 linked pallet changing systems,
make sure that the flatness and height deviation of the locating
surfaces between the pallet changing systems lies within 0.01 mm,
based on a length of 100 mm.
Observe hose nominal diameters when linking pallet-change
systems
If several pallet-change systems are activated via shared hose
lines, feed lines with the following minimum cross-sections must
be used:
Number of pallet changing
systems
Minimum nominal hose width
1
4 mm
2 - 4
6 mm
5
8 mm
Содержание NSR-A 100
Страница 1: ...Translation of Original Operating Manual Assembly and Operating Manual NSR A Pallet Changing System ...
Страница 62: ...Maintenance 62 06 00 NSR A Assembly and Operating Manual en 389722 7 4 2 Assembly drawings NSR A 160 ...
Страница 63: ...Maintenance 06 00 NSR A Assembly and Operating Manual en 389722 63 Without adapter plate ...