Schilling Marking Systems GmbH
In Grubenäcker 1 DE-78532 Tuttlingen
+49 (0)7461 9472-0
+49 (0)7461 9472-20
www.schilling-marking.de
MegaLight
Installation
Technical modifications reserved
26
Edition 2004
Picture 10: Layout of connection wires
Electrical connections
The sequence of the electrical connections involves the following phases:
•
Make sure the main switch MS is in the OFF position.(
O
)
•
Connect the DL wire between the AIMING BEAM connector (6) of the rear Management
Panel of the power supply box and the SMB socket located on the laser head body.
•
Connect the TS cable between the GALVO SUPPLY connector (4) of the rear
Management Panel of the power supply box and the SUB D 9 pin M connector on the
scanner head.
•
Connect the STS wire between the SUB-D 25 pole F connector of the DSP board and
SUB-D 25 pin F connector located on the Scanner Head;
•
Connect the PC wire between the PC connector (8) of the rear Management Panel of the
power supply box and the DB 9 pin F connector on the DSP board.
•
Connect the power supply wire (1) of the rear Management Panel.
•
Connect the monitor, mouse and keyboard to the related connectors on the PC.
PC
STS
TS
DL
OPTICAL
FIBER