Schilling Marking Systems GmbH
In Grubenäcker 1 DE-78532 Tuttlingen
+49 (0)7461 9472-0
+49 (0)7461 9472-20
www.schilling-marking.de
MegaLight
Installation
Technical modifications reserved
25
Edition 2004
The hierarchy of the components is illustrated in the following figure:
For the complete installation procedure of the DSP board and Smartist4 software see the
related dedicated manuals (Smartist4 instruction and installation manual)
Connectors
The system is equipped with the wires and connectors described below:
•
DL: plug-plug wire (length 3m) connecting the AIMING BEAM connector of the rear
Management Panel of the power supply box and the SMB socket located on the laser
resonator body.
•
TS: SUB D 9 Female socket-socket wire (length 3m) connecting the GALVO SUPPLY
connector of the rear Management Panel of the power supply box and the SUB D 9 pin
Male connector located on the scanner head.
•
STS: SUB D 25 pin Male plug-plug wire (length 3m) connecting the 25 pole Female
SUB-D connector of the DSP board and the SUB D 25 pin Female connector located on
the scanner head.
•
PC: SUB D 9 Male plug-plug wire (length 3m) connecting the PC connector of the rear
Management Panel of the power supply box and the DB 9 pin Female connector of the
DSP board.
•
Mains socket/plug wire.
Smartist4
Graphic Editor
Control program (DSP
Control)
Driver
DSP Board
Picture 9: Software management diagram