
Schambeck SFD GmbH
Refractive Index Detector RI2000
SFD101.01.3x.EN / 2014-07-10
62
http://www.schambeck-sfd.com
16.6 C
HECK AND
R
EPLACEMENT OF THE
V
ALVE
If the valve which is used to switch the path of the mobile phase in the normal measuring
mode and purge mode needs to be replaces follow the following steps:
Switch of the RI2000 refractive index detector and unplug the mains cable
■
NOTE
To prevent electrical shock make sure that the power cable is disconnected before
opening the housing of the instrument.
Remove the stainless steel capillaries from the valve body.
■
NOTE
Remind the position of the capillaries for proper re-connection.
Loosen the control cable of the valve at the main circuit board.
Loosen the two screws holding the valve body.
Remove the valve body and replace with the new one.
Tighten the holding screws and reconnect the capillaries in the correct positions.
Connect the signal cable to the contact labelled “Valve” on the main circuit board.
Start you chromatography pump to flush mobile phase through your RI2000
detector.
Check the capillary connections for any leakage.
Close the instrument’s housing.