
Schambeck SFD GmbH
Refractive Index Detector RI2000
SFD101.01.3x.EN / 2014-07-10
55
http://www.schambeck-sfd.com
16.4 L
AMP
E
XCHANGE AND
A
DJUSTMENT OF THE
L
AMP
It might be possible that you need to re-adjust the light source due to some changes in the
used light bulb due to the transport or you need to replace a burned out lamp.
The adjustment of the light source is only possible when the housing is opened. To prepare
for adjustment do the following steps:
Switch off the instrument
Unplug the mains cable to prevent electrical shock when opening the housing
■
NOTE
Some operations during the adjustment have to be done when the instrument is in
operation. So you need to re-connect the mains cable and to switch on the RI2000 refractive
index detector. When the instrument is operated with opened housing make sure that you
do NOT touch any electrical component!
Open the outer housing of the optical bench (chrome coloured)
Open the inner black housing of the optical bench. You will see the optical system
of the RI2000 refractive index detector. The components are shown below: