INSTALLING THE AT10.1
20
1.11. INSTALLING THE TEMPCO PROBE ASSEMBLY
(OPTIONAL)
The temperature compensation (or TempCo) probe contains a
temperature-dependent resistor in an epoxy module that you install near
your battery. There are three (3) steps in installing the assembly:
1. Mounting the probe assembly near the battery.
2. Installing an interconnection cable from the probe assembly to the AT10.1.
3. Wiring
the
charger end
of the cable to a terminal block on the AT10.1.
The actual temperature compensation probe (A10), or puck, is the same
for all battery types and all output voltages of the AT10.1. The accessory
part numbers differ depending on cable length ordered. See the tables in
Appendix B on page 71 for ordering information. Each kit contains
detailed
Installation Instructions
(
JA5015-00
), and a separate
Application Note
(
JD5003-00
) for further user details. The main
elements of the installation are outlined below.
!
WARNING
High voltages appear at several points inside the AT10.1. Use extreme
caution when working inside the enclosure. Do not attempt to work
inside the AT10.1 unless you are a qualified technician or electrician.
Disconnect and lock out all power from the AT10.1 before starting to
remove or replace any components. Turn the ac power off at the
distribution panel upstream from the charger. Disconnect the battery
from the AT10.1 output terminals TB1(+/-).
PROCEDURE
1. De-energize and lock out all ac and dc voltage sources to the AT10.1, and
check with a voltmeter before proceeding.
2. Mount the probe on a clean, dry surface, as close to the battery as possible,
such as the battery rack.
DO NOT
mount the probe:
•
on the battery itself
•
on unpainted wood, or bare galvanized metal.
•
on plastic surfaces
3. To apply the probe, clean the mounting surface with isopropyl alcohol, and
allow to dry thoroughly. Remove the protective backing from the double-
faced adhesive tape on the probe, and securely press it onto the surface.
4. Install the cable supplied with the temperature compensation probe kit:
•
Start at the AT10.1. The end of the cable with two (2) stripped wires and
a quick-connect terminal will be installed inside the AT10.1.
•
Leave 30in / 762mm of cable inside the enclosure, and route the other
end to the probe at the battery.
Содержание AT10.1 SERIES
Страница 78: ...APPENDIX C 72 Outline AT10 1 Group II Battery Charger NEMA 1 Style 5017 Enclosure JE5025 00...
Страница 79: ...APPENDIX C 73 http www ATSeries net PDFs JE5025 00 pdf...
Страница 80: ...APPENDIX C 74 Outline AT10 1 Group II Battery Charger NEMA 1 Style 5018 Enclosure JE5026 00...
Страница 81: ...APPENDIX C 75 http www ATSeries net PDFs JE5026 00 pdf...
Страница 83: ...APPENDIX C 77 http www ATSeries net PDFs JE5028 99 pdf...
Страница 85: ...APPENDIX C 79 http www ATSeries net PDFs JE5029 99 pdf...
Страница 87: ...APPENDIX C 81 http www ATSeries net PDFs JE5030 29 pdf...
Страница 88: ...APPENDIX C 82 Schematic AT10 1 Group II Battery Charger Standard w o Options JE5032 00...
Страница 89: ...APPENDIX C 83 http www ATSeries net PDFs JE5032 00 pdf...
Страница 90: ...APPENDIX C 84 Schematic AT10 1 Group II Battery Charger w Common Options JE5032 99...
Страница 91: ...APPENDIX C 85 http www ATSeries net PDFs JE5032 99 pdf...
Страница 92: ...APPENDIX C 86 Connection Diagram AT10 1 Group II Battery Charger Standard w o Options JE5034 00...
Страница 93: ...APPENDIX C 87 http www ATSeries net PDFs JE5034 00 pdf...
Страница 94: ...APPENDIX C 88 Connection Diagram AT10 1 Group II Battery Charger w Common Options JE5034 99...
Страница 95: ...APPENDIX C 89 http www ATSeries net PDFs JE5034 99 pdf...
Страница 101: ...USER NOTES 95...