SANY LATIN AMERICA
8-84
SY195/205/215/225C9 Crawler Hydraulic Excavator
Disassembly and Assembly
Shop Manual - June 2013
8.22.2 Installation
●
Installation is to be performed in the re-
verse order of removal.
●
Oil adding (hydraulic tank)
Add hydraulic oil through the
fi
ller opening
to the specified level. Start the engine to
circulate oil in the hydraulic system, and
check the oil level again.
●
Air bleeding
Bleed the air from the circuit between the
valve and the hydraulic cylinder.
For more information, see “Air in Each
Component - Bleed” on page 6-46.
ZXT225-1106021
45
46
45
16. Remove the
fi
xing bolts (45). Lift the con-
trol valve assembly (46) for disassembling.
Control valve assembly: 220 kg
https://www.tractormanualpdf.info/