SANY LATIN AMERICA
8-49
SY195/205/215/225C9 Crawler Hydraulic Excavator
Disassembly and Assembly
Shop Manual - June 2013
4. No.1 planetary carrier assembly
1) Remove No.1 carrier assembly (3) and
the plate (4).
2) Disassemble the carrier assembly.
Cut the rivets on the shaft (8) to re-
move the shaft (8), and remove in turn
the gear (6), bearing (9) and plate (7).
5. Ring gear
Unscrew the mounting bolts to remove the
ring gear (10).
3
4
ZX215-1006073
5
6
7
8
9
ZX215-1006074
10
ZX215-1006075
https://www.tractormanualpdf.info/