SANY LATIN AMERICA
8-34
SY195/205/215/225C9 Crawler Hydraulic Excavator
Disassembly and Assembly
Shop Manual - June 2013
8.9.2 Installation
●
Installation is to be performed in the re-
verse order of removal.
●
Open the radiator tank cover to add cool-
ant. Also add coolant to the coolant reser-
voir.
Engine coolant: approx. 22.5 L.
●
Re
fi
ll the hydraulic tank with hydraulic oil.
Hydraulic tank: approx. 225 L
●
Start the engine to circulate the coolant
in order release the foams, and check
the coolant level again.
●
Start the engine to circulate the hy-
draulic oil in the hydraulic system, and
check the oil level again.
●
Air bleeding
For more information, see “Air in Each
Component - Bleed” on page 6-46.
https://www.tractormanualpdf.info/