SANY LATIN AMERICA
8-17
SY195/205/215/225C9 Crawler Hydraulic Excavator
Disassembly and Assembly
Shop Manual - June 2013
8.6.2 Installation
●
The installation is to be performed in the
reverse order of removal.
Bolt:
39 N·m {4.0 kgf·m} + 47°
●
The rear oil seal is to be installed accord-
ing to the following procedure:
1. Apply engine oil to the lips of the rear seal.
2. Clean the oil-sealing surface.
3. Apply the sealant evenly and continuously
align the line of the rear seal.
Sealant (Tonsun 1596)
4. The installation is to be performed 3 min-
utes after application of the sealant. Be
careful not to deviate the line while apply-
ing the sealant.
ø2mm
ZX215-1006015
Sealant
Line
https://www.tractormanualpdf.info/