SANY LATIN AMERICA
8-76
SY195/205/215/225C9 Crawler Hydraulic Excavator
Disassembly and Assembly
Shop Manual - June 2013
8.20.2 Assembly
1. Install the dust seal (12) on the rotor (13).
NOTE: Let the lip face the housing while
installing the dust seal.
2. Install the six seals (10) in the housing (9).
3. Fix the rotor (13) on a work bench. Install
the housing (9) on the rotor (13).
NOTE: Since the clearance between
the housing (9) and the rotor (13) is ap-
proximately 0.1 mm, install the housing (9)
on the rotor (13) slowly and vertically. Be
careful not to damage the seals (10) and
the O-ring seal (11).
4. Use a rubber hammer to tap the housing (9)
in order to match the rotor (13) properly.
5. Install the spacer (7) and gasket (8) in the
housing (9).
6. Install the gasket (4), O-ring seal (5) and
snap ring (6) on the rotor (13).
7. Install the cover (3). Tighten the bolts (1)
and the spring washer (2).
Fixing bolts: 49 N·m{5 kgf·m}
ZX215-1006121
Dust seal
Lip
Body
https://www.tractormanualpdf.info/