9
For constant-speed type and speed-controller variable-speed type:
1. Place control unit (control box) near drive unit. Install control unit by fixing attachment bolts(*1) into
underside slot of frame.
2. Power feed cable(*2) is coming out of drive unit. Put power feed cable connector into control unit
connector(*3). (Connect tightly.)
When power source is 100/200V single-phase and control unit (control box) is delivered in separate
packaging, install control unit as follows.
NOTE: For 200V three-phase power source, standard machine has only wires from motor. Control devices
(switch etc.) are optional.
3-3. CONTROL UNIT INSTALLATION
■
BE SURE TO SWITCH OFF POWER SUPPLY
Before starting procedures below, be sure to stop conveyor and switch
off power supply. In addition, make sure plug is removed from outlet/
connector. If connected to power supply, there is a risk that conveyor
may start unexpectedly.
CAUTION
NOTE: If it is necessary to install control unit separately from drive unit, use extension cable (optional) to
make connection as shown in figure left. (If necessary, remove control unit cover to connect
connectors. In this case be sure to reinstall control unit cover.)
Control unit
Power supply cable
Extension cable
(optional)
Connector
Drive unit
Motor cable
Motor
●
Connection of control unit and motor unit
Содержание MAGDRIVE CLAM
Страница 6: ...6 2 COMPONENT NAMES 2 1 ACCUMULATING TYPE CLAM MODEL AND LIVE ROLLER TYPE CLDM MODEL...
Страница 7: ...7 2 2 CORNER ROLLER TYPE CLAMC MODEL...
Страница 15: ...15 MEMO...
Страница 26: ...26 MEMO...
Страница 27: ...27 MEMO...