is the sequence of load consumption.
BACKUP
c)
No PV Input
The inverter will first discharge the battery energy for home load consuming when no PV
input( such as in the evening or some cloudy or rainy days). If the demand is not met, the loads
will consume grid energy.
5.1.2
Feed-in Priority Mode
Go to the "Hybrid work mode" menu, and select the "Feed-in priority mode".
Under this mode, the priority of PV energy consumption will be Load > Grid > Battery, that
means the energy produced by PV gives priority to powering local loads, the excess energy is
fed into the grid
,