Electrical Connection
ESS Inverter User Manual
17
Single phase parallel connection mode-Scheme A (N≤5)
USB
PARAL RS485
No.N Inverter
DRM
①
CT/
METER BMS
PV Array
PE
①
No.2 Inverter
PV Array
①
No.1 Inverter
PV Array
Lithium battery/
lead-acid battery
②
③
①
Smart Load/
Generator
/
On-Grid Inverter
Pin Function
USB
PARAL RS485
Turn this switch
to “ON”.
G GND_S
S PARA_SYNC
L CAN_L
H CAN_H
DRM
①
CT/
METER BMS
②
③
Normal Load
Critical Load
L
N
①
Parallel communication connection
②
CT/Meter communication connection
③
BMS communication connection
* These communication cables can be connected
to any inverter, but they must be inserted into the
same inverter and we call this inverter
No. 1 inverter
.
Flow from grid
to inverter
PE
Grid
Turn this switch
to “ON”.