ENGLISH
20
Fasten
cover
16.50
and
casing
cover
16.10.
8.
Assemble
bearing
bracket
housing
33.00
and
casing
cover
16.10.
9.
Install
rotating
part
of
the
mechanical
seal
43.30
and
spacer
ring
50.40.
10.
Press
the
key
94.01
in
the
shaft,
slide
impeller
23.00
onto
the
shaft
and
tighten
impeller
nut
92.20.
Install
guards
68.10
with
captive
screws
90.13.
11.
Adjust
the
casing
seal
40.00
between
back
pullout
assembly
and
casing.
Tighten
screws
90.10.
9. 3. 2. 2
ASSEMB LY
OF
B EARING
B RA CKETS
SIZES
55
A ND
65
1.
Fit
the
shaft
unit.
2.
If
the
shaft
is
to
be
fitted
with
new
bearings,
they
should
be
heated
up
to
a
temperature
of
80º
C
before
assembling.
First,
install
the
ball
bearing
32.11,
then
the
circlip
93.21
and
finally
ball
bearing
32.10.
Make
sure
that
the
bearing
is
pressed
against
the
shoulders
of
the
shaft.
3.
If
the
lip
seals
have
been
previously
removed,
they
must
be
exchanged.
The
lip
seals
should
be
fitted
into
the
bearing
cover
with
a
bush,
pressing
on
the
external
ring
of
the
seals.
The
lips
should
point
towards
the
bearing
after
installation.
Pay
attention
to
the
installation
of
ball
bearing
covers.
4.
Install
ball
bearing
cover
on
pump
side
with
flat
gasket
40.02
and
greasing
nipple
63.60
if
needed.
5.
Insert
circlips
93.21
in
the
groove
of
the
bearing
bracket
housing
33.00.
6.
Install
ball
bearing
cover
36.01
with
the
flat
seal
40.02
and
the
greasing
nipple
63.30
if
needed.
7.
Screw
the
plug
67.20,
the
oil
level
sight
64.20
and
the
CLO
63.80
(oil
lubricated
ball
bearings).
8.
Fasten
foot
18.30
and
slide
the
thrower
onto
the
shaft
50.70.
Design
with
stuffing
box
:
9.
Slide
the
shaft
sleeve
52.40
onto
the
shaft.
10.
Install
one
of
the
packing
rings
46.10
in
the
packing
housing,
the
lantern
ring
45.80
and
then,
the
remaining
packing
rings
and
the
gland
45.20.
11.
Screw
the
stud
bolts
90.21
into
the
casing
cover,
add
washers
55.40
and
nuts
92.01.
Adjust
the
stuffing
box
tightening.
12.
Install
wear
ring
50.21
with
stop
screws
56.00.
Design
with
mechanical
seal
:
9.
Install
the
mechanical
seal
cover
47.10
with
the
mechanical
seal
stationary
part
43.30
and
its
pin
56.10
if
necessary,
then
place
the
flat
gasket
40.06
and
screws
90.24.
10.
Slide
the
shaft
sleeve
52.30
with
the
rotating
part
of
the
mechanical
seal
43.30
and
the
spacer
ring
50.40.
11.
Insert
the
wear
ring
50.21
and
stop
screws
56.00
in
casing
cover.
Screw
stud
bolts
90.22.
12.
Assemble
casing
cover
16.10
and
bearing
bracket
33.00.
Tighten
nuts
92.02.
Содержание NOLH series
Страница 2: ...NOLH INSTALLATION ET MISE EN SERVICE FRAN AIS N M S n 4086805 Ed 3 10 13...
Страница 27: ...FRAN AIS 27 Avec palier roulements lubrifi s bain d huile Montage presse toupe tresses...
Страница 32: ...FRAN AIS 32 13 DECLARATION CE...
Страница 33: ......
Страница 34: ...NOLH INSTALLATION AND OPERATING INSTRUCTIONS ENGLISH N M S n 4086805 Ed 3 10 13...
Страница 35: ...2...
Страница 59: ...ENGLISH 26 Oil lubricated ball bearings Stuffing box arrangement...
Страница 61: ...ENGLISH 28 Shaft sealing with stuffing box Lifetime lubricated ball bearings Oil lubricated ball bearings...
Страница 64: ...ENGLISH 31 13 EC DECLARATION OF CONFORMITY...