![salmson NOLH series Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/salmson/nolh-series/nolh-series_installation-and-operating-instructions-manual_3768195047.webp)
ENGLISH
14
7.3.4
Y
/
STARTER
:
Grounding
of
the
complete
pumpset
will
be
performed
with
special
care.
Earthing
will
avoid
any
electrostatic
accumulation
in
components
of
the
pumpset.
Each
part
of
the
pumpset
should
be
connected
to
earth
with
a
correctly
calibrated
bonding
strap
or
cable
(motor
winding,
motor
frame,
coupling
guard,
pump
baseframe).
7.4
USE
OF
A
FREQUENCY
INVERTER
When
pump
is
used
with
a
variable
speed
drive,
make
sure
that
the
frequency
inverter
instructions
and
operating
manual
is
available
and
known.
The
electric
motor
that
is
supplied
with
the
pump
may
be
connected
under
conditions
to
a
VSD.
Variable
speed
will
be
used
to
reach
pump
required
duty
point
on
site.
To
ensure
a
reliable
use
of
the
equipment
a
few
precautions
should
be
taken
:
Electrical
requirements
:
Variable
frequency
drive
will
not
generate
voltage
peak
higher
than
850V
(motor
phases
isolation)
and
dU/dt
values
higher
than
2500
V/µs
(winding
isolation).
If
those
values
can
be
reached,
a
filter
should
be
installed
:
ask
inverter
manufacturer
for
proper
selection
and
motor
manufacturer
for
limit
values.
Choose
a
vector
control
inverter
or
use
a
quadratic
V/F
control
inverter.
Check
that
motor
nominal
voltage
is
never
exceeded.
Power
supply
cable
should
comply
to
ATEX
regulation.
Ensure
that
motor
winding
is
equipped
with
CTP
temperature
sensors
inside.
A
physical
barrier
should
separate
power
supply
cables
and
low
voltage
cables
to
avoid
analog
signal
distortion.
Hydraulic
requirements
:
A
dedicated
suction
pipe
should
be
dedicated
to
each
pump
used
with
a
negative
suction
head
(suction
lift).
Check
that
the
pump
NPSH
R
at
minimum
speed
is
always
lower
than
system
NPSH
A
.
Mechanical
requirements
:
Lower
speed
should
not
fall
under
40%
of
pump
nominal
speed
to
avoid
any
vibrations
and
an
unstable
flow.
The
harmonic
currents
that
are
created
by
the
VSD
pass
through
motor
ball
bearings.
Standard
ball
bearings
can
be
used
up
to
55KW.
For
higher
installed
power
(see
engraved
power
on
motor
name
plate),
the
motor
should
be
equipped
with
isolated
ball
bearings
(specific
ball
bearing)
or
with
isolated
bearing
housing
(and
standard
ball
bearing).
8
START
‐
UP
8.1
PRE
‐
COMMISSIONING
If
the
pump
is
installed
in
a
potentially
explosive
atmosphere
or
when
dangerous
or
polluting
fluids
are
pumped,
it
is
advised
(Zone
2)
or
requested
(zone
1)
to
install
additional
protection
devices.
Check
following
points
:
Pump
flow
is
always
higher
than
authorized
continuous
minimum
flow,
Pump
never
runs
dry,
Normal
leakage
of
the
shaft
seal
is
controlled,
Surface
temperature
bearings
housings
is
lower
than
the
maximum
admissible
surface
temperature
in
selected
ATEX
zone,
Pressure
on
discharge
side
of
the
pump
is
lower
than
pump
maximum
allowable
working
pressure.
Set
alarm
and
stop
trips
of
sensors.
In
every
cases
check
:
Quality
of
electrical
connections,
Protection
devices
are
installed,
Auxiliary
piping
are
connected,
Flanges
connections,
Suction
line
and
pump
casing
are
filled
with
fluid,
Motor
direction
of
rotation
is
correct,
Coupling
alignment
is
correct,
Oil
level
was
checked
and
greasing
of
ball
bearings
has
been
done,
Coupling
guard
is
installed.
8.2
FILLING
/
VENTING
Before
the
very
first
start
‐
up,
pump
casing
and
suction
line
must
be
filled
with
fluid
(depending
on
piping
system
a
vacuum
pump
may
have
to
be
used).
Pump
casing
should
be
perfectly
vented
to
avoid
that
the
mechanical
seal
runs
dry.
Take
precautionary
measures
when
manipulating
dangerous,
hot,
cold
or
polluting
fluids.
Wearing
individual
protective
devices
is
necessary.
The
operator
must
known
potential
Hazards.
8.3
START
‐
UP
If
a
barrier
fluid,
flushing
fluid,
cooling
fluid
or
a
heating
fluid
is
used,
check
that
auxiliary
systems
are
activated
and
working
correctly
before
pump
start
‐
up.
Close
isolating
valve
on
pump
discharge
side.
Open
all
valves
in
suction
line.
Proceed
to
pump
priming
(if
not
already
done).
Pump
casing
and
suction
pipe
should
be
completely
filled
with
fluid.
Turn
the
pump
on
and
check
discharge
pressure
increase.
Compare
this
pressure
to
the
shutoff
pressure
available
on
the
hydraulic
curve
In
order
to
avoid
an
important
overheating
of
the
liquid
inside
the
pump
the
pump
should
not
work
more
than
20
to
30
seconds
against
a
closed
discharge
valve.
If
expected
pressure
is
reached
then
progressively
open
the
discharge
valve.
If
there
is
no
liquid
delivered
or
if
discharge
pressure
is
too
low
then
see
chapter
“trouble
shooting”.
8.4
RUNNING
CHECKS
During
operation
of
pump
in
duty
conditions
(capacity,
head,
temperature,
…)
the
following
points
must
be
checked
:
Check
and
note
pump
duty
point.
If
necessary
convert
pressure
value
from
bar
indicated
on
the
pressure
gauge
to
mwc
:
HMT
mce
=
(P
bar
x
100)
/
(SG
x
9,806)
with
SG=
fluid
Specific
Gravity.
Check
and
note
current
consumption
on
each
phase
of
the
motor.
Check
calibration
of
motor
protections.
Check
temperature
of
ball
bearings
(on
bearing
housing
surface).
Check
flexible
coupling
alignment
after
several
pump
starts
(only
for
concerned
pumps
variants).
Check
tightening
of
flanges
fastening
bolts.
Check
there
is
no
leakage
and
no
abnormal
running
noise.
When
pumping
hot
fluids,
the
definitive
coupling
alignment
should
be
done
only
when
system
nominal
temperature
is
reached
and
stabilized.
See
chapter
7.1.4
COUPLING
ALIGNMENT
Check
the
surface
temperature
on
the
bearing
bracket
and
on
the
pump
casing.
Check
pumped
fluid
temperature.
Alarm
and
stop
trips
settings
should
be
done
according
those
values.
Refer
to
specific
sensors
IOM
before
adjusting
those
trips.
If
an
external
flushing,
quench
or
an
external
heating
is
installed,
the
following
points
should
be
checked
:
External
flushing
:
Check
flushing
pressure
and
compare
with
following
maximum
values
:
Pressure
:
For
impeller
diameter
125
:
P
suction
+
0,5
bar
Содержание NOLH series
Страница 2: ...NOLH INSTALLATION ET MISE EN SERVICE FRAN AIS N M S n 4086805 Ed 3 10 13...
Страница 27: ...FRAN AIS 27 Avec palier roulements lubrifi s bain d huile Montage presse toupe tresses...
Страница 32: ...FRAN AIS 32 13 DECLARATION CE...
Страница 33: ......
Страница 34: ...NOLH INSTALLATION AND OPERATING INSTRUCTIONS ENGLISH N M S n 4086805 Ed 3 10 13...
Страница 35: ...2...
Страница 59: ...ENGLISH 26 Oil lubricated ball bearings Stuffing box arrangement...
Страница 61: ...ENGLISH 28 Shaft sealing with stuffing box Lifetime lubricated ball bearings Oil lubricated ball bearings...