![Salicru SLC TWIN PRO Series Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/salicru/slc-twin-pro-series/slc-twin-pro-series_user-manual_3710988012.webp)
12
3.2. Definition of the product.
3.2.1. Nomenclature.
SLC-8000-TWIN/3 PRO (B1) WCO “EE29503”
MOD BAT TWIN PRO 2x6AB003 40A WCO “EE29503”
EE*
Special specifications of the client.
CO
“Made in Spain” marking in the UPS and its packaging
(custom issue).
W
Neutral brand equipment.
B0
No batteries and no space for installing them.
B1
Equipment with extra charger and external batteries to the UPS.
TWIN PRO
Single phase input / output configuration.
TWIN/3 PRO Three phase input / single phase output configuration.
8000
Power in VA.
SLC
Acronym of the brand.
EE*
Special specifications of the client.
CO
“Made in Spain” marking in the UPS and packaging
(custom issue).
W
Neutral brans of the equipment.
40A
Size of the protection.
003
Last three characters of the battery code.
AB
Initials of the battery family.
6
Quantity of batteries in one string.
2x
Quantity of strings in parallel. Omit for only one.
0/
Battery module without them, but with the accessories
to install them.
TWIN PRO
Series of the battery module.
MOD BAT
Battery module.
i
Note as regards to the batteries:
Acronyms B0 and B1 stated in the nomenclature is re-
lated to the batteries:
(B0) The equipment is supplied without the batteries and
with no accessories (screws and electrical cables).
Batteries owned by the client will be installed out
from the case or cabinet of the UPS.
Under request, it is possible to supply the acces-
sories (screws and electrical cables), needed to
install and connect the external batteries.
(B1) Equipment with extra battery charger. The equip-
ment is supplied without batteries and no accesso-
ries (screws and electrical cables), corresponding
to the specific batteries in the model.
Under request is possible to supply the acces-
sories (screws and electrical cables), needed to
install and connect the batteries.
For equipments requested with no batteries, the acquisi-
tion and connection of them will always be done by the
customer and
under his responsibility
.
Data related to batteries about quantity, capacity and
voltage are stated in the battery label sticked beside the
nameplate of the equipment,
respect strictly
these data
and connection polarity of the batteries.
Those equipments with separate bypass line, a galvanic
isolation transformer has to be installed in any of both
lines that supply the UPS (rectifier input or static bypass),
to avoid the direct union of the neutral of both lines
through the internal wiring of the equipment.
This is only applicable, when both power supply lines
come from two different lines, for example:
- Two different electrical companies.
- An electrical company and a generator set, ...
USER MANUAL
Содержание SLC TWIN PRO Series
Страница 2: ......
Страница 43: ...43 SALICRU...