FP5/GP5 User’s Manual 17
Clearances
When mounting the FP5/GP5, allow sufficient clearances for effec-
tive cooling as shown below:
Notes:
1) The required clearances at the top, bottom, and both sides of the inverter are the same
for both open chassis and NEMA 1 enclosures.
2) For inverter models 25HP and less (230V & 460V), remove the top and bottom covers
to convert NEMA 1 units to open chassis
3) Allowable intake air temperature:
Open chassis: 14°F to 113°F (-10°C to +45°C)
NEMA 1: 14°F to 104°F (-10°C to 40°C)
4) When mounting units in an enclosure, install a fan or other cooling device to limit the
air temperature within the inverter to below 113°F (45°C).
Front View Side View
Figure 7 FP5/GP5 Dimension Diagram
W1
W
H
1
H
H2
D
1.97in (50mm)
1.97in (50mm)
1.18in (30mm)
4.72in (120mm)
4.72in (120mm)
Air
Air
Front View Side View
Figure 8 FP5/GP5 Clearances
Chapter 1 - Receiving & Installation
Mounting
efesotomasyon.com - Control Techniques,emerson,saftronics -ac drive-servo motor