47
4. Route the cable assembly with the electrical,
pneumatic, and hydraulic lines through the fitting
(Fig.
34).
5. If the optional lighting is used, route the lighting
power cable into the cable conduit of the run-
ways and cross beams and through the fitting (
Fig. 34).
6. Connect the pneumatic lines of the adjustable
runway to the two T-connectors (
→
Pneumatic
circuit diagram).
7. For variants with lifting tables:
Route the hydraulic line of the slave runway in
the cross beams and through the fitting ( →
Fig. 34).
34
11.7 Set up the cables
1. Pull out the 4 cables according to the cable
diagram through the cross beam and route them
out of the cross beams. They must protrude from
the cross beam by about the same distance.
Malfunction if cables are crossed
or slack.
Ensure that the cables are pulled tight within
the cross beam and are not crossed.
2. Fit the cross beam cable sheaves (
→
Fig. 35). To
do so, insert the cable sheave and the distance
sleeve into the cross beam for each cross beam.
.
11.8 Fasten the runways to the cross
beams
ATTENTION
1. Align the runways with the cross beam mounting
holes at the front and back. In doing so, make
sure that the cables and lines are in the correct
position. Cables must not fall out of the grooves
of the sheaves.
2. Check the difference in length between the two lift
diagonals (between the corner points of the cross
beams). Maximum allowed difference between
the two diagonals = 6 mm.(see Fig33
)
3. Fit the two runways to the cross beams with the
supplied bolts ( see Fig. 36).
Bolt M10*25 for SM40
Bolt M10*50 for MOT40
Bolt M12*30 for SM65/MOT65/SM35/55LT
36
Hex socket head
screw M10*35
For SM40-47-BMW