12. Electrical connections ..................................52
12.1 Safety instructions for connecting power cables ....52
12.2 Connect the lift power supply .................................53
13. Commissioning .............................................54
13.1 Test the pneumatic and hydraulic system ..............54
13.2 Test the safety mechanism .....................................54
13.3 Align the lifting table ..............................................55
13.4 Leveling the main lift...............................................55
14. Wheel alignment kit AK/FK/CK (optional) ...57
14.1 Supplied parts ........................................................57
14.2 Assembly ................................................................57
14.3 Adjustment work .....................................................60
15. Disassembly ...................................................61
16. Disposal ..........................................................62
16.1 Environmental procedures for disposal ...................62
16.2 Packaging ................................................................62
16.3 Oils, grease, and other chemical substances ..........62
16.4 Metals / Electronic waste ........................................62
ANNEX
•
SM40, SM40NB,MOT40NB-47,SM40LT
,SM65,SM55LT,SM35LT-51MB,MOT65-
55/60,SM40-47-BMW:
Pneumatic circuit diagram, wiring diagrams,
hydraulic circuit diagram, spare parts lists
•
Protocol of installation
•
Completion certificate
•
Maintenance schedule: Instructions for conducting
visual inspections and function testing
•
Inspection log
•
Master sheet for vehicle lift
•
Test report