44
11. Assembly
Incorrect installation work may
lead to serious injury and material
damage. A safety risk as well as a
risk of fatal injury exists during
operation.
Follow the instructions below carefully.
Only customer service staff authorized by the
manufacturer may assemble and commission
the post lift.
Correct installation and commissioning must
be documented in the inspection logbook.
To do so, use the form "Initial safety
inspection before installation“.
11.1 Assembly safety instructions
•
Verify that the foundation is suitable before as-
sembling.
•
Think about and prevent potential sources
of danger before assembly (
→
Chapter 1.
Intended use, improper use, incorrect behavior,
and internal incident, health & safety, and
environmental information).
•
Operators must be able to view the post lift and
the danger zone in full from the control unit
(
→
Chapter 3.3. Work area, danger zone).
•
Refer to the technical data in chapter 7.
•
Route and protect on-site power cables according
to manufacturers specifications.
•
Only qualified electricians may carry out electrical
work on the electrical equipment of the machine.
•
Only qualified staff with specialist knowledge and
experience with hydraulics or pneumatics may
work on hydraulic or pneumatic equipment.
•
When working on the hydraulics or on pneumatic
equipment, ensure that you follow the safety
regulations listed in the supplied power unit oper-
ating instructions annexed to this manual.
•
Ensure that you also follow the instructions
listed in 2. Safety.
DANGER
11.2 Quick assembly instructions
The lift components are already preasse-
mbled ex works. When assembling these
must simply be joined together, electric,
pneumatic, and hydraulic lines must be
properly connected.
1. Determine the installation site of the post lift.
Check the foundation. If necessary, reinforce the
foundations at the point where the lift columns will
be positioned.
2. Make preparations for installation. Prepare elec-
trical and pneumatic connections.
Check the foundation for unevenness and level it
out. Use spacers and shims.
3. Set down both runways and prepare them for
assembly.
4. Set down both cross beams and prepare them for
assembly. Disassemble the cable sheaves.
5. Set up the cables. To do so, pull out the cables
from the cross beams and tension them.
6. Fasten the runways to the cross beams.
7. Insert the latch bars into the latch bar brackets.
8. Stand the lift columns upright, anchor and secure
to the floor.
9. Secure the latch bars and cables.
10.Attach flexible hoses.
11. Assemble the hydraulics module. Fill the
hydraulics tank.
12.Connect the electrics.
13.Power up the post lift and connect the pneumat-
ic lines (when it stops, it will automatically lock in
the latch bars).
14. Carry out initial commissioning.
Make minor adjustments to the post lift.
15. Fit the automatic wheel chocks, drive-on ramps
and other additional components.
i