3-52
Perform the following operations if it is not possible to transfer the parameters by Peck4.exe.
1. DIP SW SETTING
2. BATTERY INSTALLATION
3. FIRMWARE INSTALLATION
4. SYSTEM PARAMETER INITIALIZE
5. TIME AND DATE SETTING
Set the date and time in the [SERVICE MENU] > [SUB MENU] > [CLOCK].
*Set the [DATE] in order of the [Year/Month/Day].
6. IP ADDRESS SETTING
Start the machine with the Service Mode and set in the User Menu.
7. FIRMWARE VERSION CONFIRMATION OF NETWORK CONTROLLER
8. HEAD RANK SETTING
9. SERIAL NUMBER INPUT
10. INK TYPE SETTING
11. SENSOR CHECK
It can be performed in the Sensor Check.
12. LIMIT & CUT DOWN POSITION INITIALIZE
13. FLUSHING POSITION ADJUSTMENT
14. LINEAR ENCODER SETUP
14. TOOL PRESSURE ADJUSTMENT
16. HEAD ALIGNMENT
Only Horizontal and Bidirectional Adjustments are required.
17. CALIBRATION
18. CROP MARK SENSOR ADJUSTMENT
19. CROP-CUT ADJUSTMENT
20. PRINT / CUT POSITION ADJUSTMENT
Revised 4
Содержание VersaCamm VP-300
Страница 39: ...2 4 2 MAIN BOARD_Arrangement Diagram Soldering Side ...
Страница 50: ...2 15 2 SERVO BOARD_Arrangement Diagram Soldering Side ...
Страница 58: ...2 23 2 2 5 SUB BOARD It indicates the version of the Board SUB BOARD_Arrangement Diagram Component Side ...
Страница 102: ...3 39 Move the Head Carriage by hand to the lock position HEADCARRIAGE Fix the I S Cover SCREW I SCOVER HOOK 20 21 ...
Страница 222: ...7 2 7 Unpacking Manual etc CD ROM etc ...