3-42
9
10
Pull out the ink tubes, and put the new ink tubes in the
Tube Guides.
Connect the new ink tubes to the tube joints (Cartridge
Side), and fix them to the Clamps.
Connect the tubes to the tube joints in the fixed positions
with K on top as shown in the figure.
7
Disconnect the ink tubes (Carriage Side) from the Y tube
joints, and put the scotch tape at the tip of the ink tube to
prevent the ink from coming out.
8
Disconnect the ink tubes (Cartridge Side) from the tube
joints, and put the scotch tape at the tip of the ink tube to
prevent the ink from coming out.
It is not necessary to replace the ink tubes of
the other side (Carriage Side) of the joints.
JOINTs
It is not necessary to replace the ink tubes of
the other side (Cartridge Side) of the joints.
JOINTs
Each four tubes are connected, and the lengths
of both ends are different.
Be careful with the fixing direction of tubes.
P/No.
P/Name
1000002670 TUBE,SJ-RDG3*4 4LINK VP-300
1000002681 TUBE,SJ-RDG3*4 4LINK VP-540
CARTRIDGE Side
Upper
Lower
CARRIAGE Side
< Front View >
K
C
M
Y
JOINTs
CLAMPs
< Left Side >
Содержание VersaCamm VP-300
Страница 39: ...2 4 2 MAIN BOARD_Arrangement Diagram Soldering Side ...
Страница 50: ...2 15 2 SERVO BOARD_Arrangement Diagram Soldering Side ...
Страница 58: ...2 23 2 2 5 SUB BOARD It indicates the version of the Board SUB BOARD_Arrangement Diagram Component Side ...
Страница 102: ...3 39 Move the Head Carriage by hand to the lock position HEADCARRIAGE Fix the I S Cover SCREW I SCOVER HOOK 20 21 ...
Страница 222: ...7 2 7 Unpacking Manual etc CD ROM etc ...