Chapter 2 Installation and Setup
35
2-5 Before Starting Operations
Spindle Run-in (Warm-up)
In any of the following cases, perform run-in (warm-up) operation for the spindle. Failure to do so may result in unstable
spindle rotation.
When using for the first time after purchase
After moving the machine and reinstalling it at a different location
After replacing the spindle unit
When using in a low-temperature environment
How to Perform Run-in (Warm-up) Operation
Carry out the following steps 1 through 4.
P. 47, “Starting and Stopping Spindle Rotation”
Step1
Speed : 5,000 rpm
Rotation time : 15 minutes
Step2
Speed : 10,000 rpm
Rotation time : 10 minutes
Step3
Speed : 15,000 rpm
Rotation time : 10 minutes
Step4
Speed : 20,000 rpm
Rotation time : 15 minutes
Содержание EGX-350
Страница 22: ...20...
Страница 36: ...34 Chapter 2 Installation and Setup 2 4 Selecting the Language Switch off the power switch OFF...
Страница 38: ...36...
Страница 86: ...Chapter 5 Feature reference 5 4 Menu List Main Menu P 88 Main Menu Descriptions of Menu Items 80...
Страница 87: ...85 Chapter 5 Feature reference Submenus P 89 I O Menu P 90 Others Menu P 91 Adjustment Menu 5 4 Menu List...
Страница 89: ...87 Chapter 5 Feature reference Copy Menu P 93 Copy Menu Descriptions of Menu Items 5 4 Menu List...
Страница 96: ...94...
Страница 108: ...106...
Страница 114: ...Chapter 8 Appendix 112 8 4 Main Unit Specification Dimensions of Outline Unit mm...
Страница 116: ...114 Chapter 8 Appendix 8 4 Main Unit Specification Workpiece table Installation area Dimensional Drawing Unit mm...
Страница 119: ...117...
Страница 120: ...118...
Страница 121: ...119...
Страница 122: ...120...
Страница 123: ......
Страница 124: ...R7 120615...