29
Chapter 2 Installation and Setup
2-2 Installation
Unpacking
Retaining materials are attached to protect the machine from vibration during shipment. Remove these after emplace-
ment.
Remove all Retaining materials. Any that remain may cause faulty operation or breakdown when the power is switched
on.
The Retaining materials are required when moving the machine to a different location. Store them carefully so that they
do not get misplaced.
WARNING
Carry out these operations before you connect the power cord.
Inadvertent powerup may result in pinched hands or other injury.
Procedure
Make sure the power cord is not connected.
Remove retainer A.
Slowly move the spindle head in the
direction of the arrow.
Take care not to subject it to strong impact.
Remove retainers B and C.
Retainer A
Hexagonal wrench
Spindle head
Hexagonal wrench
Retainer B
Retainer C
Содержание EGX-350
Страница 22: ...20...
Страница 36: ...34 Chapter 2 Installation and Setup 2 4 Selecting the Language Switch off the power switch OFF...
Страница 38: ...36...
Страница 86: ...Chapter 5 Feature reference 5 4 Menu List Main Menu P 88 Main Menu Descriptions of Menu Items 80...
Страница 87: ...85 Chapter 5 Feature reference Submenus P 89 I O Menu P 90 Others Menu P 91 Adjustment Menu 5 4 Menu List...
Страница 89: ...87 Chapter 5 Feature reference Copy Menu P 93 Copy Menu Descriptions of Menu Items 5 4 Menu List...
Страница 96: ...94...
Страница 108: ...106...
Страница 114: ...Chapter 8 Appendix 112 8 4 Main Unit Specification Dimensions of Outline Unit mm...
Страница 116: ...114 Chapter 8 Appendix 8 4 Main Unit Specification Workpiece table Installation area Dimensional Drawing Unit mm...
Страница 119: ...117...
Страница 120: ...118...
Страница 121: ...119...
Страница 122: ...120...
Страница 123: ......
Страница 124: ...R7 120615...