Rockwell Automation Publication 7712-UM001D-EN-P - October 2017
57
Maintenance
Chapter 5
Vertical Adjustment
1. Loosen the two tapties that mount the L-bracket to the base.
2. Move the L-bracket up and down as required.
3. Secure the adjusted position of auxiliary by tightening the two M6
taptie.
Figure 42 - Auxiliary Contacts Adjustment
Earthing Switch Auxiliary Contacts Inspection
Operation of electrical auxiliaries must be validated on a yearly basis.
Refer to the unit electrical drawing to determine the test locations on the
terminals located in the low voltage compartment.
IMPORTANT
Auxiliaries must be tested electrically with control power off.
Содержание Allen-Bradley 7712
Страница 6: ...6 Rockwell Automation Publication 7712 UM001D EN P October 2017 Table of Contents Notes ...
Страница 10: ...10 Rockwell Automation Publication 7712 UM001D EN P October 2017 Preface Notes ...
Страница 14: ...14 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 1 General Information Notes ...
Страница 24: ...24 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Страница 25: ...Rockwell Automation Publication 7712 UM001D EN P October 2017 25 Start up Procedure Chapter 3 ...
Страница 26: ...26 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Страница 36: ...36 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 4 Equipment Operation Notes ...
Страница 58: ...58 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 5 Maintenance Notes ...
Страница 73: ......