Chapter 5
Maintenance
Earthing Switch Auxiliary
Maintenance
Auxiliary Contacts Replacement
1. Remove all the wire connected to the auxiliary and mark each wire for
rewiring.
2. Remove the auxiliary mounting hardware (M3.5 hex nut, washer, and
cheese head screw).
3. Replace the existing auxiliary.
4. Rewire the terminals with correct wire and secure the auxiliary with the
mounting hardware.
Figure 41 - Auxiliary Contacts Replacement
Auxiliary Contacts Adjustment
The auxiliary is mounted to a slotted L-bracket using a M3.5 cheese head
screw, washer, and nut. The L-bracket with the auxiliary is mounted to the base
of the earthing switch using two M6 taptie. The switch must be positioned so
the roller of the auxiliary sits on top of the actuator hump.
Horizontal Adjustment
1. Loosen the auxiliary mounting hardware (two M3.5 hex nuts).
2. Adjust the auxiliary as required.
3. Secure the adjusted position of auxiliary by tightening the nut.
Содержание Allen-Bradley 7712
Страница 6: ...6 Rockwell Automation Publication 7712 UM001D EN P October 2017 Table of Contents Notes ...
Страница 10: ...10 Rockwell Automation Publication 7712 UM001D EN P October 2017 Preface Notes ...
Страница 14: ...14 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 1 General Information Notes ...
Страница 24: ...24 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Страница 25: ...Rockwell Automation Publication 7712 UM001D EN P October 2017 25 Start up Procedure Chapter 3 ...
Страница 26: ...26 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Страница 36: ...36 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 4 Equipment Operation Notes ...
Страница 58: ...58 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 5 Maintenance Notes ...
Страница 73: ......