30
Internal Floating Piston (IFP) Installation
2 0 0 ( A 2 ) & 4 0 0 ( B 1 ) H o u r S e r v i c e
I n t e r n a l F l o a t i n g P i s t o n ( I F P ) I n s t a l l a t i o n
Place an oil pan under the Reverb™ seatpost.
Insert the Reverb Post Bleed Tool firmly into the poppet valve port in
the post head.
Close the bleed hose clamp.
Spray the upper post and Park Tool® AV-5 vise inserts with isopropyl
alcohol and wipe them clean with a clean shop towel. The clamping
surfaces must be free of oil and grease.
Clamp the upper post into the vise inserts. Clamp only tight enough to
prevent it from spinning in the vise inserts.
1
Reverb Post Bleed Tool
2
Park Tool AV-5 Vise Inserts