The machine must be cleaned and in order.
‒
Compressed air supply must be open and pressure adjusted to
6 bar
.
‒
The film reel must be sufficiently full to guarantee operations (See "Coil replacement").
‒
The coating must be attached to the side hook.
‒
The rotating ring must be in phase (see “Timing of the rotating ring”).
‒
Check the position of the “Door opening request” selector switch.
It should be turned so as to allow the machine to start.
‒
Turn main switch in pos.
I
.
The machine is ready to perform the operation.
|
Note
At first start up after a change of operation, it is necessary to perform some trial cycles to check the quality of
the wrapping operation.
6.9.1.PUTTING THE ROTATING RING IN PHASE
The machine does not operate and does not block the film in the clamp if the rotating ring is not
in phase.
With the rotating ring in any position, pressing the Reset button will align the ring instead of starting the
operation.
Work can then be started.