Installation & Servicing Instructions Rinnai E-Series
47
Freeze protection
Freeze protection for new or existing systems must use glycol that is specially
formulated for this purpose. This includes inhibitors, which prevent the glycol from
attack the metallic components. This should be for multi-metallic components.
Make certain to check that the system
fl
uid is correct for the glycol concentration and
inhibitor level. The system should be tested at least once a year and as recommended
by the producer of the glycol solution. The allowed maximum concentration is 50%.
Use only Rinnai approved inhibitors. See below for an approved list of inhibitors.
Use only inhibited propylene glycol solutions, which are specially formulated
for central heating systems. Ethylene glycol is toxic and can attack gaskets
and seals used in the boiler and system. Approved glycols are listed below.
Additives in the installation water are not permitted.
Approved
antifreeze:
• Rhomar RhoGard Mutli-Metal (AL safe)
• Sentinel X500
(max. concentration 50%) • Noble Noburst AL
• Fernox Alphi 11
Approved system cleaner:
• Noble Noburst Hydronic System Cleaner
• Fernox F3 Cleaner
•
Rhomar
Hydro-Solv
9100
•
Sentinel
X400
The system cleaners from NoBurst, Rhomar, and Fernox are not to be used in
the boiler. The boiler must be closed off (valved off) from the rest of the system
or not connected while the cleaners are in the system. The system should then
be drained and then thoroughly fl ushed with clean water to remove all the
system cleaner.
Approved inhibitors:
• Rhomar Pro-tek 922
• Sentinel X100
• Noble Noburst AL inhibitor
9.2 Filling the heating system
For
fi
lling or topping off the installation you use the
fi
lling loop according to the following
procedure:
1 Switch on the power supply;
2 The display will show FILL;
3 All functions off (heating
, DHW
and pump );
4 Push
brie
fl
y the 'STEP'-button: P XX (XX = water pressure in PSI);
5 Open
the
fi
lling loop (Indication on display increases);
6 Fill up slowly to 16 to 18 PSI;
7 STOP appears on the display;
8 Close
the
fi
lling loop;
9 De-aerate the complete installation, start at the lowest point;
10 Check the water pressure and if necessary top it up;
11 Close the
fi
lling loop;
12 Activate the functions in use (heating
, DHW
and/or pump );
NOTICE
i
NOTICE
i
!
WARNING
NOTICE
i
Содержание E50C
Страница 43: ...Installation Servicing Instructions Rinnai E Series 43 electrical ladder diagram figure 23a ...
Страница 84: ...Installation Servicing Instructions Rinnai E Series 84 ...
Страница 127: ...Installation Servicing Instructions Rinnai E Series 127 Schéma électrique en échelle figure 23a ...