Installing casing fi gure 30
Ending the O
2
measuring procedure:
- Press the - button until
is shown (keep button pressed).
With this the procedure has ended..
- Replace the black cover on the gas valve and secure it with the screw.
For high altitude installations, elevations between 2000 ft and 4500 ft (600 m
and 1350 m), in Canadian area it is required to fi ll out the High Altitude Label.
Place the
fi
lled out High Altitude Label on the controller supporting frame, on the left
side of the rating plate.
12.4 Measuring the ionization current
-
Switch off the system using the Central Heating button
and the DHW button
- Disconnect the plug and the socket
connection on the probe and connect the
measuring device in series. See
fi
gure 29.
Select the
μ
A direct current range on the measuring
device. The measuring device must have a resolution
of at least 1
μ
A.
-
Switch on the sytem using the Central Heating button and the DHW button.
-
Press the MODE-button for 5 seconds.
-
The display will show COdE followed by an arbitrary number;
- Select by means of the
or the
button the code C123;
- Press the Store-button to con
fi
rm the code (code blinks 1 x);
- Press the MODE-button until SERV is shown;
- Press the STEP-button once until 1 is shown;
alternately 1 and OFF will be shown.
- Press
the button until the maximum value (in kW) is achieved;
The boiler will burn on full load (value on display in kW)
value
in
BTU/hr
=
x3415
-
Measure the ionization. When the boiler is in full load the ionization current must
be > 4
μ
A and write down this value in the log book.
- Press
the button until OFF is shown (keep button pressed).
-
Switch off the system using the Central Heating button and the DHW button
-
Disconnect the measuring device and restore the plug and the socket connection
on the probe.
-
Switch on the sytem using the Central Heating button and the DHW button.
Ionization test
fi gure 29
Содержание E50C
Страница 43: ...Installation Servicing Instructions Rinnai E Series 43 electrical ladder diagram figure 23a ...
Страница 84: ...Installation Servicing Instructions Rinnai E Series 84 ...
Страница 127: ...Installation Servicing Instructions Rinnai E Series 127 Schéma électrique en échelle figure 23a ...