manualshive.com logo in svg
background image

START AQUA 24 BI

8

ENGLISH

9

4.7 

Maintenance

Periodic maintenance is essential to the safety, efficiency and lifeti-

me of the boiler. The appliance must be systematically controlled at 

regular intervals to make sure it works correctly and efficiently and 

conforms to legislative provisions in force.

Maintenance reduces consumption and polluting emissions, and en-

sures the product functions reliably over time.

Before starting maintenance:

-  Analyse the combustion products to check the boiler operating sta-

tus, then shut the power off by setting the main system switch to 

“OFF”.

-  Close the heating and domestic hot water system gas and water 

cocks.

  After performing maintenance as required, the original settings 

must be restored and the combustion products must be ana-

lysed again to ensure the boiler is operating correctly.

4.8 

Adjustments

START AQUA 24 BI

 boilers are supplied for operation with natural 

gas (G20) or LPG (G30/G31) and are factory-set as specified on the 

technical data plate. For LPG: the boiler has been regulated in I3B/P 

category (G30). If you need to regulate in I3+ or I3P categories (G31) 

exclude pressure regulator.

However, if it is necessary to repeat the adjustments, for example 

after non-scheduled maintenance, replacing the gas valve or after 

conversion from natural gas to LPG, or vice versa, proceed as de-

scribed below.

  The minimum and maximum output settings and the minimum 

and maximum electric heating settings must be made in the 

specified sequence and exclusively by the Technical Assis-

tance Service.

-  Turn the main system switch OFF.

-  Remove the case after unscrewing the screws.

-  Press the side buttons of the panel and then turn it forwards.

-  Unscrew the tapping point screw downstream of the gas valve by 

approximately two turns and connect a pressure gauge.

Maximum and minimum DHW output setting

-  Open a hot water tap to the maximum flow rate.

-  On the control panel, set the function selector to 

 (Summer) 

mode and set the DHW temperature selector to the maximum.

-  Turn the boiler on by setting the main switch to “ON”.

-  Check that the pressure reading on the gauge is stable. If the read-

ing is not stable, use a milli-ammeter (in series with a modulator 

wire) to check that the maximum available current is delivered to 

the modulator (120 mA for G20, and 165 mA for LPG).

-  Remove the protection cap from the adjustment screws carefully 

using a screwdriver.

-  Using a fork wrench CH10, turn the adjustment nut for maximum 

output to obtain the value specified in 

Table 1

.

TABLE 1

NATURAL 

GAS

(G20)

LIQUID GAS

BUTANE 

(G30)

PROPANE 

(G31)

Maximum DHW pressure 

downstream of valve 

(tolerance ± 10%) 

9,90

27,60

35,50

mbar

-  Disconnect a faston clamp from the modulator.

-  Wait for the pressure on the gauge to stabilise at the minimum 

value.

-  Use a hex wrench – taking care not to press the internal shaft – to 

adjust the red screw for the DHW minimum setting and calibrate 

until the gauge shows the value specified in 

Table 2

.

TABLE 2

NATURAL 

GAS

(G20)

LIQUID GAS

BUTANE 

(G30)

PROPANE 

(G31)

Minimum DHW pressure 

downstream of valve 

(tolerance ± 10%)

1,60

4,80

6,00

mbar

-  Reconnect a faston clamp on the modulator.

-  Close the domestic hot water cock.

Pressure 

tapping point 

downstream 

of gas valve 

Protection 

cap

Maximum output 

adjustment nut

Minimum DHW  

adjustment Allen screw

Faston  

connectors

Electrical setting of minimum and maximum heating

  The “electrical setting” function is activated and deactivated ex-

clusively via the jumper (JP1).

The function can be enabled by:

-  Powering up the board with jumper JP1 wired in, and the function 

selector set to Winter, regardless of whether other operating re-

quests are active or not.

-  Wiring in jumper JP1, with the function selector set to Winter, with-

out any heating requests in progress.

  Activating the function involves starting up the burner by simu-

lating a heating request.

To calibrate:

-  Turn the boiler off

-  Remove the case, press the side buttons of the panel and then 

turn it forwards 

-  Remove the screws on the cover protecting electrical parts (

B

, fig. 

10) and access the board

-  Wire in jumper JP1 to enable the dials on the control panel for set-

ting the minimum and maximum heating values

-  Ensure that the function selector is set to Winter

-  Connect the boiler to the mains

  Electrical board powered (230 V)

Minimum 

heating

 setting

Maximum 

heating 

setting

Turn the heating water temperature dial to the minimum heating 

value as specified in 

Table 3

TABLE 3

NATURAL 

GAS

(G20)

LIQUID GAS

BUTANE 

(G30)

PROPANE 

(G31)

Minimum heating pressure 

downstream of valve 

(tolerance ± 10%) 

1,60

4,80

6,00

mbar

-  Wire in jumper JP2

-  Turn the DHW temperature adjustment dial to the maximum heat-

ing value as specified in 

Table 4

TABLE 4

NATURAL 

GAS

(G20)

LIQUID GAS

BUTANE 

(G30)

PROPANE 

(G31)

Maximum pressure in 

heating mode downstream 

of valve (tolerance ±10%)

9,90

27,60

35,50

mbar

-  Remove jumper JP2 to memorise the maximum heating value

-  Remove jumper JP1 to memorise the minimum heating value and 

to exit the calibration procedure

Содержание START AQUA 24 BI

Страница 1: ...START AQUA 24 BI EN INSTALLER AND USER MANUAL HU TELEP T I S FELHASZN L I K ZIK NYV...

Страница 2: ...rticle 7 2 and Annex III of directive 92 42 EEC Electromagnetic compatibility directive 2004 108 EC Low voltage directive 2006 95 EC Directive 2009 125 EC Ecodesign for energy using appliances Directi...

Страница 3: ...ntact the Technical Assistance service or a professionally qualified technician immediately Do not touch the appliance when barefoot or with any wet parts of the body Do not clean the boiler without h...

Страница 4: ...e boiler is run on combustible gas of a specific weight great er than that of air the electrical parts must be positioned at a minimum height of 500 mm from the ground The boiler cannot be installed o...

Страница 5: ...ormer with a secondary circuit connected to the earth The earth wire must be approximately 2 cm longer than the other wires You must use a general trip switch to disconnect the line in compliance with...

Страница 6: ...to within this range the boiler sup plies domestic hot water and heating In the event of a heating re quest the boiler turns on The digital display indicates the heating water temperature In the event...

Страница 7: ...of the panel and then turn it forwards Unscrew the tapping point screw upstream of the gas valve by ap proximately two turns and connect a pressure gauge Open a hot water tap to the maximum setting t...

Страница 8: ...ntil the pressure is between 1 and 1 5 bar Turn the function selector back to the required setting If there are frequent drops in pressure please request support from the Technical Assistance Service...

Страница 9: ...Using a fork wrench CH10 turn the adjustment nut for maximum output to obtain the value specified in Table 1 TABLE 1 NATURAL GAS G20 LIQUID GAS BUTANE G30 PROPANE G31 Maximum DHW pressure downstream...

Страница 10: ...e combustion chamber and tighten the screws securing it to the gas manifold Position the cable gland with the spark plug wires on the air cham ber Reconnect the spark plug wire Refit the combustion ch...

Страница 11: ...doors and windows to ventilate the room close the gas shut off device contact the Technical Assistance service or a professionally qualified technician immediately Do not touch the boiler when barefoo...

Страница 12: ...uest The boiler operates until the controlled temperatures are reached or the heat demand is met after which it returns to standby status F Temporary shutdown During temporary absences weekends short...

Страница 13: ...rvice Fault A04 The digital display shows the fault code together with the symbol Check the pressure shown on the water gauge if the pressure is less than 0 3 bar set the function selector to OFF and...

Страница 14: ...110 90 NOx S A at maximum minimum less than p p m 150 130 200 130 220 130 NOx Class 2 Maximum heating operating pressure bar 3 Minimum pressure for standard operation bar 0 45 Maximum temperature allo...

Страница 15: ...Seasonal space heating energy efficiency s 78 For boiler space heaters and boiler combination heaters useful heat output For boiler space heaters and boiler combination heaters useful efficiency At ra...

Страница 16: ...vagy szakk pzett szem lyzetet Tilos a kaz nt meg rinteni mez tl b s nedves testr szekkel Tilos b rmilyen folyamatot v gezni miel tt a kaz nt lev lasztja az elektromos t ph l zatr l a berendez s f kap...

Страница 17: ...a a kaz nt a leveg nehezebb fajs ly ghet g zzal l tja el akkor az elektromos r szeket a padl t l 500 mm n l maga sabb helyre telep tse A kaz nokat k lt rre nem telep theti mert nem k lt ri m k d sre t...

Страница 18: ...del s eredete nem is mert akkor haszn ljon szigetel transzform tort m sodlagos f ldel ssel A f ldel s p r cm rel legyen hosszabb a t bbin l K telez A CEI EN 60335 1 szabv nyoknak megfelel t bbp lus me...

Страница 19: ...at Helyezze a kaz nt elektromos ell t s al Nyissa ki a g zcsapot hogy lehet v tegye az zemanyag ram l s t Szab lyozza a k rnyezeti termoszt tot a k v nt h m rs kletre 20 C Forgassa el a m k d skiv las...

Страница 20: ...k s ekkor v g rehajthatja a k vetkez folyamatokat Ellen rizheti az ell t g z nyom s t Ellen rizheti az g st Az ell t g z nyom s ellen rz se helyezze a berendez s f kapcsol j t kikapcsolt ll sba Hajtsa...

Страница 21: ...03 rendelleness gek ll tsa a m k d s kiv laszt t ll sba OFF v rjon 5 6 m sod percet s ll tsa vissza a k v nt helyzetbe Ha a felenged si pr b lkoz sok nem aktiv lj k jra a kaz nt akkor k rje a M szaki...

Страница 22: ...y s a minim lis s maxi m lis elektromos f t s szab lyoz s t a megadott sorrendben v gezze kiz r lag a M szaki gyf lszolg lat val Helyezze a berendez s f kapcsol j t kikapcsolt ll sba Szerelje le az tk...

Страница 23: ...ment se n lk l a k vetkez k t m d egyik t v lassza a ll tsa a m k d skiv laszt t ll sba kikapcsolt felenge dett b sz ntesse meg az ell t fesz lts get A tar z funkci automatikusan befejez dik a minim l...

Страница 24: ...t s Tiszt tsa meg a k penyt a vez rl panelt a f nyezett s a m anyag r szeket szappanos v zt l nedves ruh val Makacs szennyez d s eset n 50 os v z s denatur lt szesz keve r kkel vagy speci lis term kk...

Страница 25: ...zagot rez Ebben az esetben szell ztesse ki a helyis get nyissa ki az ajt kat s az abla kokat z rja el az zemanyag elz r berendez st azonnal t j koztassa a M szaki gyf lszolg latot vagy szakk pzett sze...

Страница 26: ...ktromos s az zemanya ell t st akt van hagyva a kaz n a k vetkez rendszerekkel v dett Fagy sg tl Amikor a meleg v z h m rs klete 5 C al s llyed s bekapcsolja a keringet t s sz ks g eset n az g fejet mi...

Страница 27: ...t t kikapcsolt OFF ll sba s nyissa meg a felt lt csapot am g 1 s 1 5 bar k zti nyom s rt ket r el Ezt k vet en helyezze a m k d skiv laszt t a k v nt helyzetbe a kaz n 2 perces l gtelen t ciklust v ge...

Страница 28: ...rt ken 6 0 2 5 4 1 1 7 7 0 3 0 6 8 2 8 CO S A maximum minimum rt ken alacsonyabb mint p p m 80 80 240 400 120 90 110 90 NOx S A maximum minimum rt ken alacsonyabb mint p p m 150 130 200 130 220 130 N...

Страница 29: ...y Pn vleges 24 kW Szezon lis helyis gf t si hat sfok s 78 Helyis gf t kaz nok s kombin lt kaz nok eset ben hasznos h teljes tm ny Helyis gf t kaz nok s kombin lt kaz nok eset ben hat sfok M rt h telje...

Страница 30: ...iler at low temperature Caldeira de baxa temperatura Chaudi re basse temp rature 12 13 17 EN Boiler functional elements 1 Filling tap 2 Water pressure switch 3 Discharge valve 4 3 way valve 5 Safety v...

Страница 31: ...n M Heating delivery AC Hot water outlet AF Cold water inlet HU Hidraulikus k r 1 Leereszt csap 2 Biztons gi szelep 3 By pass 4 Kipufog szelep 5 V z nyom skapcsol 6 Keringtet 7 L gtelen t szelep 8 F h...

Страница 32: ...eat adjustment indicates the connection to an external probe Flame Flame failure this icon is visualised together with irregularity code A 01 Irregularity indicates any operating irregularities togeth...

Страница 33: ...isplay and integrated ignition transformer P1 Potentiometer to select off summer winter reset temperature heating P2 Potentiometer to select domestic hot water set point P3 Potentiometer to select tem...

Страница 34: ...OLUME cm3 DATA DAT MODIFICATO DA MODIFIED BY DESCRIZIONE DELLA MODIFICA DISEGNATORE DESIGNER DESCRIZIONE FINITURA MATERIALE RIELLO QUOTE SENZA INDICAZIONE DI TOLLERANZA E RIFER PROCEDURA OPERATIVA RIE...

Страница 35: ...400 450 500 550 600 650 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 A 6 metre standard modulating pump curves 6 m teres sz riamodul tor keringet g rbe B 7 metre high head modul...

Страница 36: ...START AQUA 24 BI 36 8 7 6 5 3 4 370 50 mm 50 mm 370 mm R M G AC AF...

Страница 37: ...START AQUA 24 BI 37 12 11 10 9 B 13 E A B C D 3 4 1 2 5 3 4 1 2 5 14...

Страница 38: ......

Страница 39: ......

Страница 40: ...Cod 20117085 03 16 Ed 0...

Отзывы: