-  Flue thermostat, which intervenes setting the boiler to safety stop 

status if combustion products return in the hood.

  If a safety device is tripped, there is a boiler fault. Please con-

tact the Technical Assistance Service immediately.

The flue thermostat is tripped not only by a defect in the combustion 

product evacuation circuit, but also by random atmospheric condi-

tions.

Therefore, after a short wait, the boiler can be restarted (see the 

chapter “First start-up”).

  If the flue thermostat trips repeatedly, this means combustion 

products are evacuated towards the boiler installation area. 

This means combustion may be incomplete and there is a risk 

of carbon monoxide forming. This is a serious hazard. In this 

case, please contact the Technical Assistance Service immedi-

ately.

  The boiler must not be operated, even temporarily, if the safety 

devices are not functioning or have been tampered with.

  The safety devices must be replaced by the Technical Assis-

tance Service, using original manufacturer components only. 

Please see the spare parts catalogue supplied with the boiler. 

After repairs, always perform an ignition test.

2.2 

Pump

The residual head for the heating system is represented, according 

to flow rate, on the graph (fig. 1 - fig. 2).

The heating system pipelines must be sized according to the residual 

head available on the system.

Take into account that boiler efficiency is only ensured when there is 

sufficient water circulation in the heat exchanger.

For this reason, the boiler is equipped with an automatic bypass sys-

tem that regulates the correct water flow rate in the heat exchanger 

in all operating conditions.

The boiler is fitted with an anti-block function that starts an operating 

cycle every 24 hours of standby with the selector set in any position.

  The anti-block function is only active if the boilers are powered 

electrically.

  Never run the pump without water present.

The speed can be selected using the lever at the side of the pump.

3 -  INSTALLATION

3.1 

Product delivery

The 

START AQUA 24 BI

 boiler is supplied in a single box protected 

by carton packaging.

The boiler is supplied with the following material:

-  installer and user manual

-  labels with bar code

-  boiler support plate.

  The instruction manuals are an integral part of the boiler. 

Please read the manuals and store them in a safe place.

3.2 

Dimensions and weight (fig. 3)

START AQUA 24 BI

L

600

mm

P

450

mm

H

940

mm

Net weight

56

kg

3.3 

Handling

After removing all packaging, the boiler is handled manually using 

the support frame (fig. 4).

3.4 

Boiler room

The boiler must be installed in rooms fitted with suitably sized ventila-

tion outlets compliant with current technical standards.

  Take into consideration the space that is required to access the 

safety and control devices and to perform maintenance.

  Check that the appliance's electrical protection rating is suit-

able for the place of installation.

  If the boiler is run on combustible gas of a specific weight great-

er than that of air, the electrical parts must be positioned at a 

minimum height of 500 mm from the ground.

  The boiler cannot be installed outside as it is not designed for 

operation outdoors.

3.5 

Installation in older systems or circuits requiring 

renovation

When 

START AQUA 24 BI

 boilers are installed in older systems or 

systems requiring renovation, ensure that:

-  the flue exhaust is suitable for the temperatures produced by com-

bustion, calculated and built in line with the regulations, and is as 

straight as possible, airtight, insulated and is not blocked or con-

stricted. 

-  the electrical system complies with the specific regulations and is 

installed by qualified technicians

-  the gas conveyance line and any tanks (LPG) comply with specific 

regulations

-  the expansion tank ensures full absorption of the expansion of the 

fluid in the system

-  the flow rate and useful head of the pump are suitable for the sys-

tem

-  the system is washed, free of dirt and build-up, de-aerated and 

correctly sealed.

-  there is a treatment system when the supply/top-up water is of a 

specific type (see the table for possible reference values).

Supply water values

pH

6-8

Electrical conductivity

less than 200 μS/cm (25°C)

Chloride ions

less than 50 ppm

Sulphuric acid ions

less than 50 ppm

Total iron

less than 0.3 ppm

Alkalinity M

less than 50 ppm

Total hardness

less than 35°F

Sulphur ions

None

Ammonia ions

None

Silicon ions

less than 20 ppm

  The manufacturer declines all liability for possible damage 

caused by incorrect installation of the flue exhaust system.

  If the supply water has a total hardness of between 25°F and 

50°F, install the domestic water kit (polyphosphate dispenser). 

If the total hardness is above 50°F, the kit progressively de-

creases in efficiency and a higher performing appliance or a 

water softening system should be installed. In case of total 

hardness below 25°F, a suitably sized filter should be installed 

if the water supplied form the mains is not perfectly clean/can-

not be cleaned.

  In existing buildings, this natural draught boiler must only be 

connected to a flue system shared by several homes to evacu-

ate the combustion residue outside the room where the boiler 

is installed. For combustion, the boiler takes in air directly from 

the room and is equipped with a draught diverter. Due to re-

duced efficiency, any other use of this boiler must be avoided at 

all times, as this would lead to increased energy consumption 

and higher operation costs.

3.6 

Boiler installation

To install the boiler correctly, please remember that (fig. 5):

-  The boiler must not be installed above a stove or other cooking 

equipment

-  Flammable substances must not be left in the room where the 

boiler is installed

-  Walls sensitive to heat (for example those in wood) must be pro-

tected with suitable insulation

-  Minimum clearances must be observed to enable technical inter-

ventions and maintenance.

-  Ensure a clearance of 370 mm from the bottom of the boiler to the 

cabinet. When cleaning the magnesium anode, there must be suf-

ficient space to enable disassembly.

Содержание START AQUA 24 BI

Страница 1: ...START AQUA 24 BI EN INSTALLER AND USER MANUAL HU TELEP T I S FELHASZN L I K ZIK NYV...

Страница 2: ...rticle 7 2 and Annex III of directive 92 42 EEC Electromagnetic compatibility directive 2004 108 EC Low voltage directive 2006 95 EC Directive 2009 125 EC Ecodesign for energy using appliances Directi...

Страница 3: ...ntact the Technical Assistance service or a professionally qualified technician immediately Do not touch the appliance when barefoot or with any wet parts of the body Do not clean the boiler without h...

Страница 4: ...e boiler is run on combustible gas of a specific weight great er than that of air the electrical parts must be positioned at a minimum height of 500 mm from the ground The boiler cannot be installed o...

Страница 5: ...ormer with a secondary circuit connected to the earth The earth wire must be approximately 2 cm longer than the other wires You must use a general trip switch to disconnect the line in compliance with...

Страница 6: ...to within this range the boiler sup plies domestic hot water and heating In the event of a heating re quest the boiler turns on The digital display indicates the heating water temperature In the event...

Страница 7: ...of the panel and then turn it forwards Unscrew the tapping point screw upstream of the gas valve by ap proximately two turns and connect a pressure gauge Open a hot water tap to the maximum setting t...

Страница 8: ...ntil the pressure is between 1 and 1 5 bar Turn the function selector back to the required setting If there are frequent drops in pressure please request support from the Technical Assistance Service...

Страница 9: ...Using a fork wrench CH10 turn the adjustment nut for maximum output to obtain the value specified in Table 1 TABLE 1 NATURAL GAS G20 LIQUID GAS BUTANE G30 PROPANE G31 Maximum DHW pressure downstream...

Страница 10: ...e combustion chamber and tighten the screws securing it to the gas manifold Position the cable gland with the spark plug wires on the air cham ber Reconnect the spark plug wire Refit the combustion ch...

Страница 11: ...doors and windows to ventilate the room close the gas shut off device contact the Technical Assistance service or a professionally qualified technician immediately Do not touch the boiler when barefoo...

Страница 12: ...uest The boiler operates until the controlled temperatures are reached or the heat demand is met after which it returns to standby status F Temporary shutdown During temporary absences weekends short...

Страница 13: ...rvice Fault A04 The digital display shows the fault code together with the symbol Check the pressure shown on the water gauge if the pressure is less than 0 3 bar set the function selector to OFF and...

Страница 14: ...110 90 NOx S A at maximum minimum less than p p m 150 130 200 130 220 130 NOx Class 2 Maximum heating operating pressure bar 3 Minimum pressure for standard operation bar 0 45 Maximum temperature allo...

Страница 15: ...Seasonal space heating energy efficiency s 78 For boiler space heaters and boiler combination heaters useful heat output For boiler space heaters and boiler combination heaters useful efficiency At ra...

Страница 16: ...vagy szakk pzett szem lyzetet Tilos a kaz nt meg rinteni mez tl b s nedves testr szekkel Tilos b rmilyen folyamatot v gezni miel tt a kaz nt lev lasztja az elektromos t ph l zatr l a berendez s f kap...

Страница 17: ...a a kaz nt a leveg nehezebb fajs ly ghet g zzal l tja el akkor az elektromos r szeket a padl t l 500 mm n l maga sabb helyre telep tse A kaz nokat k lt rre nem telep theti mert nem k lt ri m k d sre t...

Страница 18: ...del s eredete nem is mert akkor haszn ljon szigetel transzform tort m sodlagos f ldel ssel A f ldel s p r cm rel legyen hosszabb a t bbin l K telez A CEI EN 60335 1 szabv nyoknak megfelel t bbp lus me...

Страница 19: ...at Helyezze a kaz nt elektromos ell t s al Nyissa ki a g zcsapot hogy lehet v tegye az zemanyag ram l s t Szab lyozza a k rnyezeti termoszt tot a k v nt h m rs kletre 20 C Forgassa el a m k d skiv las...

Страница 20: ...k s ekkor v g rehajthatja a k vetkez folyamatokat Ellen rizheti az ell t g z nyom s t Ellen rizheti az g st Az ell t g z nyom s ellen rz se helyezze a berendez s f kapcsol j t kikapcsolt ll sba Hajtsa...

Страница 21: ...03 rendelleness gek ll tsa a m k d s kiv laszt t ll sba OFF v rjon 5 6 m sod percet s ll tsa vissza a k v nt helyzetbe Ha a felenged si pr b lkoz sok nem aktiv lj k jra a kaz nt akkor k rje a M szaki...

Страница 22: ...y s a minim lis s maxi m lis elektromos f t s szab lyoz s t a megadott sorrendben v gezze kiz r lag a M szaki gyf lszolg lat val Helyezze a berendez s f kapcsol j t kikapcsolt ll sba Szerelje le az tk...

Страница 23: ...ment se n lk l a k vetkez k t m d egyik t v lassza a ll tsa a m k d skiv laszt t ll sba kikapcsolt felenge dett b sz ntesse meg az ell t fesz lts get A tar z funkci automatikusan befejez dik a minim l...

Страница 24: ...t s Tiszt tsa meg a k penyt a vez rl panelt a f nyezett s a m anyag r szeket szappanos v zt l nedves ruh val Makacs szennyez d s eset n 50 os v z s denatur lt szesz keve r kkel vagy speci lis term kk...

Страница 25: ...zagot rez Ebben az esetben szell ztesse ki a helyis get nyissa ki az ajt kat s az abla kokat z rja el az zemanyag elz r berendez st azonnal t j koztassa a M szaki gyf lszolg latot vagy szakk pzett sze...

Страница 26: ...ktromos s az zemanya ell t st akt van hagyva a kaz n a k vetkez rendszerekkel v dett Fagy sg tl Amikor a meleg v z h m rs klete 5 C al s llyed s bekapcsolja a keringet t s sz ks g eset n az g fejet mi...

Страница 27: ...t t kikapcsolt OFF ll sba s nyissa meg a felt lt csapot am g 1 s 1 5 bar k zti nyom s rt ket r el Ezt k vet en helyezze a m k d skiv laszt t a k v nt helyzetbe a kaz n 2 perces l gtelen t ciklust v ge...

Страница 28: ...rt ken 6 0 2 5 4 1 1 7 7 0 3 0 6 8 2 8 CO S A maximum minimum rt ken alacsonyabb mint p p m 80 80 240 400 120 90 110 90 NOx S A maximum minimum rt ken alacsonyabb mint p p m 150 130 200 130 220 130 N...

Страница 29: ...y Pn vleges 24 kW Szezon lis helyis gf t si hat sfok s 78 Helyis gf t kaz nok s kombin lt kaz nok eset ben hasznos h teljes tm ny Helyis gf t kaz nok s kombin lt kaz nok eset ben hat sfok M rt h telje...

Страница 30: ...iler at low temperature Caldeira de baxa temperatura Chaudi re basse temp rature 12 13 17 EN Boiler functional elements 1 Filling tap 2 Water pressure switch 3 Discharge valve 4 3 way valve 5 Safety v...

Страница 31: ...n M Heating delivery AC Hot water outlet AF Cold water inlet HU Hidraulikus k r 1 Leereszt csap 2 Biztons gi szelep 3 By pass 4 Kipufog szelep 5 V z nyom skapcsol 6 Keringtet 7 L gtelen t szelep 8 F h...

Страница 32: ...eat adjustment indicates the connection to an external probe Flame Flame failure this icon is visualised together with irregularity code A 01 Irregularity indicates any operating irregularities togeth...

Страница 33: ...isplay and integrated ignition transformer P1 Potentiometer to select off summer winter reset temperature heating P2 Potentiometer to select domestic hot water set point P3 Potentiometer to select tem...

Страница 34: ...OLUME cm3 DATA DAT MODIFICATO DA MODIFIED BY DESCRIZIONE DELLA MODIFICA DISEGNATORE DESIGNER DESCRIZIONE FINITURA MATERIALE RIELLO QUOTE SENZA INDICAZIONE DI TOLLERANZA E RIFER PROCEDURA OPERATIVA RIE...

Страница 35: ...400 450 500 550 600 650 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 A 6 metre standard modulating pump curves 6 m teres sz riamodul tor keringet g rbe B 7 metre high head modul...

Страница 36: ...START AQUA 24 BI 36 8 7 6 5 3 4 370 50 mm 50 mm 370 mm R M G AC AF...

Страница 37: ...START AQUA 24 BI 37 12 11 10 9 B 13 E A B C D 3 4 1 2 5 3 4 1 2 5 14...

Страница 38: ......

Страница 39: ......

Страница 40: ...Cod 20117085 03 16 Ed 0...

Отзывы: