manualshive.com logo in svg
background image

START AQUA 24 BI

4

ENGLISH

5

PRE-ASSEMBLY TEMPLATE FIXTURE

The 

START AQUA 24 BI

 boiler has been designed and produced to 

be installed in heating and domestic hot water production systems. 

The position and dimensions of the hydraulic fittings are stated in the 

illustrations (fig. 6).

-  Position the support plate using a spirit level. Check it is horizon-

tally level and that the boiler support surface is flat. If necessary, 

add shims to level the surface correctly.

-  Mark the fixing points. 

-  Remove the plate and drill the holes.

-  Fit the plate to the wall using suitable plugs. 

-  Use a spirit level to check the plate is level.

BOILER FIXTURE

-  Hook up the boiler to the supports on the plate.

3.7 

Hydraulic connections (fig. 7)

Connect the boiler to the system by inserting both the domestic water 

shut-off valve and the heating system shut-off valves. A specific heat-

ing system valve kit and heating valve kit with filter are available..

DHW SYSTEM

Install a pressure reducer between the boiler and DHW supply mains.

For special water types and to reduce the frequency of cleaning the 

boiler interior and/or pipelines, install a water treatment system.

  The choice and installation of system components is left to the 

discretion of the installer, who must operate according to the 

rules of good technical practice and current legislation.

  If the supply water has a total hardness of between 25°F and 

50°F, install the domestic water kit. If the total hardness is above 

50°F, the kit progressively decreases in efficiency and a higher 

performing appliance or a water softening system should be 

installed. In case of total hardness below 25°F, a suitably sized 

filter should be installed if the water supplied form the mains is 

not perfectly clean/cannot be cleaned.

  The outlet of the boiler safety valve must be connected to an 

adequate collection and drainage system. The boiler manufac-

turer declines all liability for any flooding caused by the safety 

valve.

  A carry case kit is available so that connections can be made 

quickly, without wasting time on each system.

M

 

heating delivery

R

  

heating return

G

 gas

AF

  

cold water inlet

AC

 

hot water outlet

3.8 

Electrical connections (fig. 8-9-10)

The 

START AQUA 24 BI 

boiler is factory-wired and must simply be 

connected to the electrical mains (using the power cable supplied). 

The room thermostat (RT) or timer must be connected to the relative 

terminals.

-  Turn the main system switch OFF. 

-  Unscrew the case screws (

A

).

-  Move the bottom of the case forward and then upwards to detach 

it from the frame.

-  Press the side buttons of the panel and then turn it forwards.

-  Loosen the screws of the cover protecting electrical parts 

B

 and 

remove the cover.

  Low voltage safety room thermostat (voltage-free contact).
  When using a phase-phase power supply, use a tester to de-

termine which of the two wires has the greater potential com-

pared to the earth and connect it to the L terminal. Connect the 

remaining wire to the N terminal.

  The boiler can also operate with a phase-neutral or phase-

phase power supply. For floating power supplies, i.e. those 

which have no earth connection, use an insulation transformer 

with a secondary circuit connected to the earth.

  The earth wire must be approximately 2 cm longer than the 

other wires.

  You must:

-  use a general trip-switch to disconnect the line in compliance 

with CEI-EN 60335-1 standards (contact opening at least 3.5 

mm, category III)

use cables with a cross-section of ≥ 1.5 mm

2

 and respect the 

L (phase) - N (neutral) connection

-  ensure that the amperage on the switch is adequate for the 

boiler’s electrical power rating. Please refer to the technical 

data to check the electrical rating of the model installed

-  connect the appliance to an efficient earthing system

-  ensure that the power socket can be accessed after instal-

lation.

  The use of gas or water pipes to earth this appliance is strictly 

prohibited.

  The manufacturer declines any liability for damage caused by 

failure to comply with the wiring diagrams.

  The installer is responsible for ensuring that the appliance has 

an efficient earthing system. The manufacturer declines all li-

ability for any damage caused by a faulty earthing circuit or the 

lack of an efficient earthing circuit.

3.9 

Gas connections

The 

START AQUA 24 BI

 boilers must be connected to the main gas 

supply in compliance with current installation standards.

Before connecting the appliance, ensure that:

-  the type of gas is compatible with the boiler model being installed

-  all pipelines are thoroughly cleaned.

  The gas supply system must be suited to the flow rate of the 

boiler and must be fitted with all safety and control devices as 

envisaged by current standards. The use of a suitably sized 

filter is recommended.

  At the end of installation, check all connections are properly 

sealed.

3.10  Flue gas outlet and combustion air suction (fig. 11-12)

The discharge pipeline and connection to the flue must comply with 

current local and national standards and legislation.

Use rigid ducts. Joints between parts must be airtight. All compo-

nents must be resistant to high temperatures, condensate and me-

chanical stress.

 

START AQUA 24 BI

 boilers are equipped with a flue thermostat 

positioned on the right side of the hood. If combustion products 

are returned, this device immediately shuts down operation of 

the boiler.

  The combustion air vents must comply with current technical 

standards.

  Discharge ducts without insulation are a potential source of 

danger.

  Do not seal off or reduce the size of the air vents in the room 

where the boiler is installed.

3.11  System filling and emptying (fig. 13)
START AQUA 24 BI

 boilers are equipped with a filling valve (

D

) on 

the heating system and primary circuit of the boiler.

FILLING

Ensure that the boiler drain device (

A

) is closed.

DHW system:

-  open the cold water inlet tap to fill the boiler

-  to check that the boiler is full, open a hot water tap and wait for 

water to be delivered.

Heating system:

-  open the automatic air vent valve cap (

C

) by two or three turns 

-  slowly fill the system via the filler valve (

D

) until the hydrometer 

shows a pressure value between 1 and 1.5 bar 

-  close the system filler valve (

D

-  air is bled automatically from the 

START AQUA 24 BI

 boiler via the 

vent valve on start-up (see chapter “First start-up”).

EMPTYING

Before emptying the boiler, disconnect the electric power supply by 

switching the main system switch to “OFF”.

Close all shut-off devices of the DHW and heating circuits.

Содержание START AQUA 24 BI

Страница 1: ...START AQUA 24 BI EN INSTALLER AND USER MANUAL HU TELEP T I S FELHASZN L I K ZIK NYV...

Страница 2: ...rticle 7 2 and Annex III of directive 92 42 EEC Electromagnetic compatibility directive 2004 108 EC Low voltage directive 2006 95 EC Directive 2009 125 EC Ecodesign for energy using appliances Directi...

Страница 3: ...ntact the Technical Assistance service or a professionally qualified technician immediately Do not touch the appliance when barefoot or with any wet parts of the body Do not clean the boiler without h...

Страница 4: ...e boiler is run on combustible gas of a specific weight great er than that of air the electrical parts must be positioned at a minimum height of 500 mm from the ground The boiler cannot be installed o...

Страница 5: ...ormer with a secondary circuit connected to the earth The earth wire must be approximately 2 cm longer than the other wires You must use a general trip switch to disconnect the line in compliance with...

Страница 6: ...to within this range the boiler sup plies domestic hot water and heating In the event of a heating re quest the boiler turns on The digital display indicates the heating water temperature In the event...

Страница 7: ...of the panel and then turn it forwards Unscrew the tapping point screw upstream of the gas valve by ap proximately two turns and connect a pressure gauge Open a hot water tap to the maximum setting t...

Страница 8: ...ntil the pressure is between 1 and 1 5 bar Turn the function selector back to the required setting If there are frequent drops in pressure please request support from the Technical Assistance Service...

Страница 9: ...Using a fork wrench CH10 turn the adjustment nut for maximum output to obtain the value specified in Table 1 TABLE 1 NATURAL GAS G20 LIQUID GAS BUTANE G30 PROPANE G31 Maximum DHW pressure downstream...

Страница 10: ...e combustion chamber and tighten the screws securing it to the gas manifold Position the cable gland with the spark plug wires on the air cham ber Reconnect the spark plug wire Refit the combustion ch...

Страница 11: ...doors and windows to ventilate the room close the gas shut off device contact the Technical Assistance service or a professionally qualified technician immediately Do not touch the boiler when barefoo...

Страница 12: ...uest The boiler operates until the controlled temperatures are reached or the heat demand is met after which it returns to standby status F Temporary shutdown During temporary absences weekends short...

Страница 13: ...rvice Fault A04 The digital display shows the fault code together with the symbol Check the pressure shown on the water gauge if the pressure is less than 0 3 bar set the function selector to OFF and...

Страница 14: ...110 90 NOx S A at maximum minimum less than p p m 150 130 200 130 220 130 NOx Class 2 Maximum heating operating pressure bar 3 Minimum pressure for standard operation bar 0 45 Maximum temperature allo...

Страница 15: ...Seasonal space heating energy efficiency s 78 For boiler space heaters and boiler combination heaters useful heat output For boiler space heaters and boiler combination heaters useful efficiency At ra...

Страница 16: ...vagy szakk pzett szem lyzetet Tilos a kaz nt meg rinteni mez tl b s nedves testr szekkel Tilos b rmilyen folyamatot v gezni miel tt a kaz nt lev lasztja az elektromos t ph l zatr l a berendez s f kap...

Страница 17: ...a a kaz nt a leveg nehezebb fajs ly ghet g zzal l tja el akkor az elektromos r szeket a padl t l 500 mm n l maga sabb helyre telep tse A kaz nokat k lt rre nem telep theti mert nem k lt ri m k d sre t...

Страница 18: ...del s eredete nem is mert akkor haszn ljon szigetel transzform tort m sodlagos f ldel ssel A f ldel s p r cm rel legyen hosszabb a t bbin l K telez A CEI EN 60335 1 szabv nyoknak megfelel t bbp lus me...

Страница 19: ...at Helyezze a kaz nt elektromos ell t s al Nyissa ki a g zcsapot hogy lehet v tegye az zemanyag ram l s t Szab lyozza a k rnyezeti termoszt tot a k v nt h m rs kletre 20 C Forgassa el a m k d skiv las...

Страница 20: ...k s ekkor v g rehajthatja a k vetkez folyamatokat Ellen rizheti az ell t g z nyom s t Ellen rizheti az g st Az ell t g z nyom s ellen rz se helyezze a berendez s f kapcsol j t kikapcsolt ll sba Hajtsa...

Страница 21: ...03 rendelleness gek ll tsa a m k d s kiv laszt t ll sba OFF v rjon 5 6 m sod percet s ll tsa vissza a k v nt helyzetbe Ha a felenged si pr b lkoz sok nem aktiv lj k jra a kaz nt akkor k rje a M szaki...

Страница 22: ...y s a minim lis s maxi m lis elektromos f t s szab lyoz s t a megadott sorrendben v gezze kiz r lag a M szaki gyf lszolg lat val Helyezze a berendez s f kapcsol j t kikapcsolt ll sba Szerelje le az tk...

Страница 23: ...ment se n lk l a k vetkez k t m d egyik t v lassza a ll tsa a m k d skiv laszt t ll sba kikapcsolt felenge dett b sz ntesse meg az ell t fesz lts get A tar z funkci automatikusan befejez dik a minim l...

Страница 24: ...t s Tiszt tsa meg a k penyt a vez rl panelt a f nyezett s a m anyag r szeket szappanos v zt l nedves ruh val Makacs szennyez d s eset n 50 os v z s denatur lt szesz keve r kkel vagy speci lis term kk...

Страница 25: ...zagot rez Ebben az esetben szell ztesse ki a helyis get nyissa ki az ajt kat s az abla kokat z rja el az zemanyag elz r berendez st azonnal t j koztassa a M szaki gyf lszolg latot vagy szakk pzett sze...

Страница 26: ...ktromos s az zemanya ell t st akt van hagyva a kaz n a k vetkez rendszerekkel v dett Fagy sg tl Amikor a meleg v z h m rs klete 5 C al s llyed s bekapcsolja a keringet t s sz ks g eset n az g fejet mi...

Страница 27: ...t t kikapcsolt OFF ll sba s nyissa meg a felt lt csapot am g 1 s 1 5 bar k zti nyom s rt ket r el Ezt k vet en helyezze a m k d skiv laszt t a k v nt helyzetbe a kaz n 2 perces l gtelen t ciklust v ge...

Страница 28: ...rt ken 6 0 2 5 4 1 1 7 7 0 3 0 6 8 2 8 CO S A maximum minimum rt ken alacsonyabb mint p p m 80 80 240 400 120 90 110 90 NOx S A maximum minimum rt ken alacsonyabb mint p p m 150 130 200 130 220 130 N...

Страница 29: ...y Pn vleges 24 kW Szezon lis helyis gf t si hat sfok s 78 Helyis gf t kaz nok s kombin lt kaz nok eset ben hasznos h teljes tm ny Helyis gf t kaz nok s kombin lt kaz nok eset ben hat sfok M rt h telje...

Страница 30: ...iler at low temperature Caldeira de baxa temperatura Chaudi re basse temp rature 12 13 17 EN Boiler functional elements 1 Filling tap 2 Water pressure switch 3 Discharge valve 4 3 way valve 5 Safety v...

Страница 31: ...n M Heating delivery AC Hot water outlet AF Cold water inlet HU Hidraulikus k r 1 Leereszt csap 2 Biztons gi szelep 3 By pass 4 Kipufog szelep 5 V z nyom skapcsol 6 Keringtet 7 L gtelen t szelep 8 F h...

Страница 32: ...eat adjustment indicates the connection to an external probe Flame Flame failure this icon is visualised together with irregularity code A 01 Irregularity indicates any operating irregularities togeth...

Страница 33: ...isplay and integrated ignition transformer P1 Potentiometer to select off summer winter reset temperature heating P2 Potentiometer to select domestic hot water set point P3 Potentiometer to select tem...

Страница 34: ...OLUME cm3 DATA DAT MODIFICATO DA MODIFIED BY DESCRIZIONE DELLA MODIFICA DISEGNATORE DESIGNER DESCRIZIONE FINITURA MATERIALE RIELLO QUOTE SENZA INDICAZIONE DI TOLLERANZA E RIFER PROCEDURA OPERATIVA RIE...

Страница 35: ...400 450 500 550 600 650 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 A 6 metre standard modulating pump curves 6 m teres sz riamodul tor keringet g rbe B 7 metre high head modul...

Страница 36: ...START AQUA 24 BI 36 8 7 6 5 3 4 370 50 mm 50 mm 370 mm R M G AC AF...

Страница 37: ...START AQUA 24 BI 37 12 11 10 9 B 13 E A B C D 3 4 1 2 5 3 4 1 2 5 14...

Страница 38: ......

Страница 39: ......

Страница 40: ...Cod 20117085 03 16 Ed 0...

Отзывы: